3/29/24 – 4/05/24 Riverfront Sports Field Top Dress and Leveling Work Advisory

Begin:  Friday, March 29, 2024

End:      Friday, April 5, 2024

Building(s) or Area(s) Affected:  Riverfront Sports Field

Scope:  Top dress and leveling will take place on the Riverfront Sports Field.  200-tons of turf top-dress material is expected to be delivered 3/29/24 and/or 4/1/24.  Work on the field is scheduled to begin the week of 4/01/24.

Services Impacted:  Work related noise can be expected.  Roadways and sidewalks in the surrounding area will also be impacted.

Work Performed By:  Rexius Landscape

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Image of Riverfront Fields

3/18/24 – 3/29/24 Student Tennis Center, Jane Sanders Stadium, Outdoor Tennis Courts, and Athletic Field 2 Sidewalk Closure

Begin:  Monday, March 18, 2024, at 7:00 am

End:      Friday, March 29, 2024, at 6:00 pm

Building(s) or Area(s) Affected:  Sidewalk and path by Student Tennis Center, Jane Sanders Stadium, Outdoor Tennis Courts, and Athletic Field 2

Scope:  The sidewalk and pathway by the Student Tennis Center, Jane Sanders Stadium, Outdoor Tennis Courts, and Athletic Field 2 will be replaced.

Services Impacted:  The pathway will be closed to through travel including bikes and pedestrians.

Work Performed By:  Wildish Construction

ContactRenee Benoit, CPFM Owner’s Representative, 541-346-5080

Current construction and impacts information can be found on the UO Maps site.

Sidewalk closure map by the tennis courts and Jane Sanders Stadium 3/18/24 - 3/29/24

3/04/24 – 3/08/24 CPFM Compound Road Restriction Advisory

Begin:  Monday, March 4, 2024

End:      Friday, March 8, 2024

Building(s) or Area(s) Affected:  CPFM Compound – Roadway South of the CPS Plant

Scope:  The roadway between the CPS Plant and the Millrace Waterway will be closed intermittently throughout the week to allow for work on the south side of the CPS plant.

Services Impacted:  Access will be restricted at different times throughout the week.

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Image of area south of the CPS Plant

2/23/24 Huestis Hall Sealant Application, Odor Advisory, and Exhaust Fan Shutdown

UPDATE:
The time has been extended an additional two hours, from 6:00 am to 11:00 am.

 

Begin:  Friday, February 23, 2024, at 6:00 am

End:      Friday, February 23, 2024, at 9:00 11:00 am

Building(s) or Area(s) Affected:  Huestis Hall, Willamette Hall, Lokey Labs

Scope:  Graffiti proof sealant will be applied to the exterior brick on Level 1/ground floor of Huestis Hall. The early morning hours were selected to decrease the amount of disruption to occupants during a typical work day. This notice is subject to rescheduling if weather conditions are unfavorable for installation.

Outage affecting Huestis basement: AHU 1 and 2 and lab exhaust fans will be offline during this work activity.

Advisory to Lokey Labs and Willamette Hall: Neighbors of Huestis Hall may experience odors due the sealant material.

Work Performed By:  Milne, Lease Crutcher Lewis

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880

Current construction and impacts information can be found on the UO Maps site.

Map showing Huestis Hall

2/08/24 – 3/06/24 CPFM Compound Increased Construction Traffic Advisory

UPDATE:
Due to delays in compacting and Geotech inspections, the end date has been moved to March 6th.

 

Begin:  Thursday, February 8, 2024

End:      February 16,  Wednesday, March 6, 2024

Building(s) or Area(s) Affected:  CPFM Compound

Scope:  Hoffman Construction will be staging backfill rock material west of CPS & the tank. See attached map.

Services Impacted:  There will be Hoffman truck traffic to and from the staging area during daytime and evening hours, for the duration.

Work Performed By:  Hoffman Construction

ContactDenise Stewart, CPFM Owner’s Representative, 541-346-2280 or 541-335-1258

Current construction and impacts information can be found on the UO Maps site.

Overhead map of CPFM

2/05/24 – 2/09/24 Millrace 1, Millrace 2, Fine Arts C, and Woodshop Tunnel Work and Noise Advisory

Begin: Monday, February 5, 2024

End: Friday, February 9, 2024

Building(s) or Area(s) Affected: Millrace 1, Millrace 2, Fine Arts C, and Woodshop. See attached map.

Scope: Hoffman will be excavating for a new utility tunnel between the Fine Arts C and Woodshop buildings.  This work will occur at night between 7:00 pm and 7:00 am in order not to impact classes in adjacent buildings.

Services Impacted: No services are expected to be impacted. This will create noise in the area.

Work Performed By: Hoffman Construction

Contact: Denise Stewart, CPFM Owner’s Representative, 541-346-2280 or 541-335-1258

Current construction and impacts information can be found on the UO Maps site.

Image of Fine Arts and Knight Campus 2 new Utility Tunnel Work Area 2/5 thru 2/9/2024

1/15/24 – 1/18/24 Riverfront Parkway Road and Sidewalk Emergency Closure

UPDATE 1/17/24 5:16 pm:
Riverfront barriers will be removed by 8:00 am tomorrow.

 

UPDATE 1/17/24 10:42 am:
Riverfront barrier removal will extend into later this afternoon to keep the removal crew working safely.  Goal is to be open by end of day.  Thanks for your understanding.

 

UPDATE 1/17/24 9:03 am:
All the ice is gone from the tower crane, so Hoffman will be removing barriers from Riverfront Parkway sometime this morning.  We’ll post another update when this is complete.

 

Begin:  Monday, January 15, 2024

End:      Thursday, January 18, 2024, at 8:00 am

Building(s) or Area(s) Affected:  Riverfront Parkway, Knight Campus, and the Millrace Garage

Scope:  Due to ice build-up on the tower crane at Knight Campus Building 2 and the risk of falling ice during any thaw, Riverfront Parkway will be closed to vehicles and pedestrians until the risk is eliminated.

Services Impacted:  Riverfront Parkway road and sidewalks will be unavailable during this time.

Special Instructions:  Please see the UO Alerts blog re conditions on campus https://alerts.uoregon.edu/

Work Performed By:  Hoffman Construction

ContactDenise Stewart, CPFM Owner’s Representative, 541-346-2280 or 541-335-1258

Current construction and impacts information can be found on the UO Maps site.

Image of Riverfront Parkway and access routes to the MIllrace Garage

1/12/24 Campus Storm Basins Cleanout Advisory

Begin:  Friday, January 12, 2024

End:      Friday, January 12, 2024

Building(s) or Area(s) Affected:  Campus Wide

Scope:  Roadway and parking lot critical storm basins will be cleaned out with a commercial vac truck this Friday.

Services Impacted:  A commercial vehicle will be moving throughout the campus areas during this time.

Work Performed By:  Mid-State Industrial

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Image of Campus 1-10-24

POSTPONED – Lot 2 Construction Activity and Access Advisory

UPDATE 11/08/23:
Due to parts delay and scheduling conflicts with Facilities, this work has been postponed.  A new notification will be sent prior to starting the project.

 

BeginMonday, November 13, 2023  Postponed

End:      Wednesday, November 22, 2023  Postponed

Building(s) or Area(s) Affected:  Lot 2, CPFM Warehouse Bldg. 136, CPFM Administrative Quonset, CPFM Compound

Scope:  Construction associated with the replacement of the vehicle and pedestrian gates at the main entrance to the CPFM compound will begin November 13th.  This will result in intermittent closure of the main entrance while work is being performed in the roadway (asphalt cutting, excavation, installation of electrical lines, new fence panels, backfill, and resurfacing). Vehicle plates will be used to allow travel over open trenches when work is not actively being performed in the roadway.  The schedule remains fluid based on weather and contractor availability. Notification updates will be provided as the project progresses.

Services Impacted:

  • When access is restricted, vehicles should use the west entrance to the compound.
  • Caution is advised as vehicles will be traveling in both directions and the roadway narrows to one lane in some areas.

Work Performed By:  Contractor and CPFM Facilities

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Map of construction area and detour route for Lot 2 gate work

10/17/23 Riverfront Parkway Traffic Advisory

Begin:  Tuesday, October 17, 2023

End:      Tuesday, October 17, 2023

Building(s) or Area(s) Affected:  Riverfront Parkway, Knight Campus Building 1, Millrace Garage, 1600 Millrace & other buildings on Millrace Drive.

Scope:  Tuesday, October 17th, a concrete pour is scheduled at the Knight Campus Building 2 construction site.

Services Impacted:

  • There will be frequent concrete truck traffic on Riverfront Parkway both northbound from Franklin Blvd. and southbound onto Franklin Blvd for the duration of the day.
  • Hoffman will have flaggers located along Riverfront Parkway to assist with traffic.
  • No roads will be closed.

Work Performed By:  Hoffman Construction

ContactDenise Stewart, CPFM Owner’s Representative, 541-346-2280 or 541-335-1258

Current construction and impacts information can be found on the UO Maps site.

Image of Riverfront Parkway by Knight Campus 2 Building Site

10/20/23 East 13th Avenue Pothole Repair

Begin:  Friday, October 20, 2023, at 7:00 am

End:      Friday, October 20, 2023, at 10:00 am

Building(s) or Area(s) Affected:  East 13th Avenue

Scope:  Due to a pothole repair, East 13th Avenue, between the roundabout north of EMU and University Street, will be shut down during part of the morning.

Services Impacted:  Vehicle traffic will need to detour during this time.

Work Performed By:  Western Asphalt

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Image of pothole work location on E 13th Ave 10-20-23

10/02/23 – 3/31/25 Kalapuya Ilihi Repair Work Advisory

UPDATE:
The project end date has been extended to March 31, 2025.

 

Begin:  Monday, October 2, 2023

End:      Monday, August 30, 2024  March 31, 2025

Building(s) or Area(s) Affected:  Kalapuya Ilihi plus Lots 34C, 34E and 55

Scope:  Kalapuya Ilihi Repairs: On October 2, 2023 we will set up fencing around Kalapuya Ilihi that will impact sidewalks and parking spaces adjacent to Kalapuya.

Services Impacted:

  • This will affect several spaces within Parking Lots 34C, 34E, and 55 plus sidewalks in the area.
  • The four impacted loading and unloading spaces on Moss Street dedicated to the Moss Street Children’s Center will be moved immediately to the north of the impacted spots.

Work Performed By:  Fortis Construction

ContactGeorge Bleekman, CPFM Owner’s Representative, 541-346-2625

Current construction and impacts information can be found on the UO Maps site.

Image of construction impacts around Kalapuya Ilihi

KI Fence Line

9/21/23 – 9/22/23 Campus Move In Traffic and Parking Impacts Advisory

As the UO welcomes new resident students to campus, Transportation Services would like to make you aware of some upcoming traffic and parking impacts that are expected the week of September 18th. To help accommodate this large move-in process, we encourage parkers to avoid parking lots around the residence halls this week.

Traffic impacts related to street closures near residence halls on 9/21 and 9/22:

  • Agate Street and portions of 13th, 15th, and 17th Avenues will be restricted to Move-in traffic and vehicles on UO business.
  • All 13th Ave. traffic must enter from 13th Ave. and Franklin Blvd. and should expect delays.
  • Permit holders will be able to access UO lots but should expect delays.
  • 13th Ave. between University and Agate Streets will be restricted to westbound traffic only.
  • The 13th Ave. Garage will be open to permit holders.
  • Lots 29A, 29D, 33, 36A and 37 will be reserved for Move in.

For questions or concerns, please contact Transportation Services at 541-346-5444.

Current construction and impacts information can be found on the UO Maps site.

Image of affected roads during Move In 9/21/23 - 9/22/23

9/11/23 – 9/18/23 Agate Street plus Lots 38, 39, and 43 Closure Advisory for Prefontaine Classic

Begin:  Monday, September 11, 2023

End:      Monday, September 18, 2023

Scope:  The University of Oregon is hosting the Prefontaine Classic at Hayward Field on Saturday, September 16th and Sunday, September 17th and attendance is expected to be robust.

Event impacts and related closures, as outlined below, will start on Monday, September 11th and continue through Monday, September 18th. Please anticipate an increase in traffic around campus and at the Millrace Garage during this time.

Agate Street Closures:

  • Agate Street closed from 17th Ave. to 18th Ave. beginning 9/11.
  • Agate Street closed from 15th Ave. to 18th Ave. 9/13 – 9/18.
  • Agate Street closed from 13th Ave. to 18th Ave. 9/16 – 9/17.

Campus Lot Closures

  • Lot 38 closed 9/13 – 9/17.
  • Lot 39 and 43 closed 9/16 & 9/17.

ContactJames McGladrey, UO Transportation Services Field Operations Manager, 541-346-2676

Image showing Agate Street plus Lots 38, 39, and 43 affected by the Prefontaine Classic 9-11-23 thru 9-18-23

9/14/23 – 3/29/24 North Campus Concrete Truck Activity Advisory

Begin:  Thursday, September 14, 2023

End:      Friday, March 29, 2024

Building(s) or Area(s) Affected:  North Campus, Lot 3B, and Gallery Way.

Scope:  Periodically between 9/14/23 and 3/29/24 there will be concrete trucks delivering to the utility tunnel construction located between the Woodshop and Fine Arts Building C. The map below shows the truck routes in and out of the site.

Services Impacted:  On days that concrete trucks are delivering, parking stall #39 in Lot 3B will be closed for trucks to safely navigate the left hand turn off of Gallery Way.

Work Performed By:  Hoffman Construction

ContactDenise Stewart, CPFM Owner’s Representative, 541-346-2280 or 541-335-1258

Current construction and impacts information can be found on the UO Maps site.

Map of North Campus Concrete Truck Route 9-14-23 thru 3-29-24

8/21/23 – 9/29/23 East 13th Ave. (between Kincaid St. and Agate St.) Surveying Advisory

UPDATE:
This notice has been extended through the end of the month.

 

Begin:  Monday, August 21, 2023

End:      Friday, September 8  29, 2023

Building(s) or Area(s) Affected:  East 13th Ave. between Kincaid St. and Agate St.

Scope:  A field survey crew will be surveying site utilities and topography along East 13th Avenue between Kincaid and Agate Streets for the next 3 weeks.

Services Impacted:  Pedestrian, bike, and vehicular access will not be impacted.

Work Performed By:  Contractor

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880

Current construction and impacts information can be found on the UO Maps site.

Image of East 13th Avenue between Kincaid St. and Agate St.

8/28/23 – 9/01/23 Riverfront Parkway Road Closure

Begin:  Monday, August 28, 2023

End:      Friday, September 1, 2023

Building(s) or Area(s) Affected:  Riverfront Parkway between Millrace Drive and Franklin Boulevard

Scope:  All lanes of Riverfront Parkway will be closed to modify utilities beneath the roadway.  See the image below for detour routes.

Services Impacted:

  • Riverfront Parkway will be closed to all vehicle traffic during this time as well as the eastbound left turn lane on Franklin Blvd.
  • The east sidewalk will remain open for pedestrian traffic.

Work Performed By:  Hoffman Construction

ContactDenise Stewart, CPFM Owner’s Representative, 541-346-2280 or 541-335-1258

Current construction and impacts information can be found on the UO Maps site.

Image of detour route for Riverfront Parkway 8/28/23 - 9/1/23

8/09/23 Millrace 1 & 2, Fine Arts A, B, C, & Woodshop Electrical Power Shutdown

Begin:  Wednesday, August 9, 2023, at 7:00 am

End:      Wednesday, August 9, 2023, at 7:00 pm

Building(s) or Area(s) Affected:  Millrace 1, Millrace 2, Fine Arts A, Fine Arts B, Fine Arts C, & Woodshop.

Scope:  EWEB will be installing new power feeders to a new utility vault and contractors will be reconnecting buildings to new EWEB feeders.

Services Impacted:  Electrical power will be offline during this time.

Work Performed By:  EWEB and Hoffman Construction

ContactDenise Stewart, CPFM Owner’s Representative, 541-346-2280 or 541-335-1258

Current construction and impacts information can be found on the UO Maps site.

Image of the Fine Arts and Millrace Studio buildings that will be affected

8/9/23 Millrace Path and Gallery Walk Axis Power Pole Work Advisory

UPDATE:  EWEB has changed the schedule and will now complete this work on 8/9/23

BeginThursday, August 10, 2023 – morning Wednesday, August 9, 2023

End:      Thursday, August 10, 2023 – morning Wednesday, August 9, 2023 by 10:00 a

Building(s) or Area(s) Affected:  Area SW of Urban Farm

Scope:  On the morning of August 10th, EWEB will be removing an existing power pole near the intersection of the Millrace Path and Gallery Walk Axis that will temporarily detour bike and pedestrian traffic. (See map below)

Services Impacted:

  • This will affect access in the Millrace Path and Gallery Walk Axis area.
  • Bike and pedestrian traffic will be rerouted along Franklin Blvd. and Onyx Street.

Work Performed By:  EWEB

ContactDenise Stewart, CPFM Owner’s Representative, 541-346-2280 or 541-335-1258

Current construction and impacts information can be found on the UO Maps site.

map to closure

8/5/23, 8/6/23, 8/12/23, 8/13/23 Summer Parking Lot Painting Closure Advisory for 2023

1st Weekend:  Saturday, August 5, and Sunday, August 6, 2023

2nd Weekend:  Saturday, August 12, and Sunday, August 13, 2023

Scope: Summer parking lot maintenance will be performed on the weekends for the locations listed below.

Services Impacted: Lots will be closed the preceding Friday night for both Saturday and Sunday work.

Extra Notes:  The lots will be re-opened as soon as the paint is dry.

Parking Lots Impacted Saturday, August 5, 2023:
2 – CPFM lot east of power plant and south of CPFM Warehouse
3A – Strip north of Wilkinson House and Millrace Studios and south of ZIRC
3B – Parking areas north of Lock Shop and buildings north of Zebrafish
10 – North side of Lawrence Hall
12A – North of Cascade Annex West and East
12B – North of Streisinger, Klamath, and NE of Onyx Bridge
14 – NE corner by Oregon Hall
47 – West and south of Rainier
57 – North of 1600 Millrace and south of the Millrace Garage
60 – SE of 1900 Millrace
Millrace Riverfront

Parking Lots Impacted Sunday, August 6, 2023:
23 – East of Johnson Hall and west of Collier House
25 – East of JSMA and west of Susan Campbell
26 – South of Gerlinger Annex
27 – Horseshoe parking east of Hendricks
28 – Horseshoe parking east of Gerlinger Hall
29A – South of EMU
29D – Street parking west of Straub
30 – South and east of McArthur Court and west and north of Student Tennis
36A – East of Carson and west of University Health Services
36B – SW corner of University Health Services
Carson Loading Dock
Johnson Fire Lane
13th Ave Crosswalk
15th Ave Crosswalks
University Street

Parking Lots Impacted Saturday, August 12, 2023:
34A – NE of Knight Law Center
34B – N of Viv Olum Child Center
34C – E of Many Nations Longhouse/Viv Olum/Oregon Law Clinic
34E – Lot south of Global Scholars Hall and north of Kalapuya Ilihi
37 – Long lot east of Hamilton and west of Ford Alumni Center
38 – North of Agate Hall
41 – NE parking by Outdoor Program Barn and SW of Jane Sanders Stadium
43 – South of Knight Law Center
49 – South of Riley Hall
50 – West and east of Barnhart Residence Hall
13th Ave. Garage

Parking Lots Impacted Sunday, August 13, 2023:
6B – Half-moon north of Miller Theatre and McKenzie Hall, north side of East 11th Ave.
7B – NW corner of McKenzie Hall
16A – NW of PLC and SW of Condon
16B – West of Condon
19 – South of HEDCO and north of Clinical Services
20 – East of Education Annex and north of Music
21 – South of Clinical Services
42 – West of UO Annex
58 – North and east of 1715 Franklin
59 – Romania
UOPD Lot (unnumbered)
Baker Downtown Center Loading Dock

To be Scheduled
EC Cares W. 12th Ave.

Work Performed By: Transportation Services

Contact: James McGladrey, UO Transportation Services Field Operations Manager, 541-346-2676

 

7/31/23 – 9/8/23 Student Recreation Center Turf Field 3 and 4 Resurfacing Advisory

Begin:  Monday, July 31, 2023

End:     Friday, September 8, 2023

Building(s) or Area(s) Affected:  Hayward Field and Jane Sanders Stadium

Scope:  Replacement of artificial turf on the Student Recreation Center fields 3 and 4. Adjoining areas will be closed to the community for the duration of the project.

Services Impacted:  The Outdoor Tennis Courts and the square track around the tennis courts and Artificial Turf Field 3 will be inaccessible during this time.

Work Performed By:  Coast to Coast Turf

Contact:  David Mason at dsmason@uoregon.edu, 541-346-5679

Current construction and impacts information can be found on the UO Maps site.

Map of Turf Field

7/28/23 – 7/29/23 Riverfront Parkway Road Closure

Begin:  Friday, July 28, 2023

End:      Saturday, July 29, 2023

Building(s) or Area(s) Affected:  Riverfront Parkway between Millrace Drive and Franklin Boulevard

Scope:  All lanes of Riverfront Parkway will be closed to install a tower crane; the east sidewalk will remain open for pedestrian traffic.  See the image below for detour routes.

Services Impacted:  Riverfront Parkway will be closed to all vehicle traffic during this time.

Work Performed By:  Hoffman Construction

ContactDenise Stewart, CPFM Owner’s Representative, 541-346-2280 or 541-335-1258

Current construction and impacts information can be found on the UO Maps site.

map of construction area

7/13/23 Millrace Studios 1 & 2, Fine Arts C, & Woodshop Electrical Outage

Begin:  Thursday, July 13, 2023, at 9:00 am

End:      Thursday, July 13, 2023, at 3:00 pm

Building(s) or Area(s) Affected:  Millrace Studios 1 & 2, Fine Arts C (Metalsmithing/Jewelry) & Woodshop

Scope:  EWEB will be setting a new power pole at the NE corner of the Millrace Studio 2 building.

Services Impacted:

  • Power will be off to Millrace 1, Millrace 2, Fine Arts C (Metalsmithing/Jewelry) & Woodshop during the shutdown hours.
  • EWEB set-up and tear-down work will occur before and after the shutdown hours.
  • Vehicle traffic north of the work area will be maintained but may have the possibility of minor interruptions.
  • Please note, Gallery way south of the work area is already shutdown via a separate & earlier notice.

Special Instructions:  Please shut down and unplug all multi-function copier devices as well as any printers during scheduled power outages. The software on these machines can be negatively affected due to the power surge when the power is turned back on.  A power surge can corrupt the clone files in the machines and change preconfigured settings.  For questions, please contact Kati Kronholm at 541-346-5370 or katik@uoregon.edu.  For non-copier questions, please reach out to the contact person listed below.

Work Performed By:  EWEB

ContactDenise Stewart, CPFM Owner’s Representative, 541-346-2280 or 541-335-1258

Current construction and impacts information can be found on the UO Maps site.

Map of area involved with the power pole installation

7/19/23 Riverfront Parkway Southbound Lane Shutdown

Begin:  Wednesday, July 19, 2023, at 6:00 am

End:      Wednesday, July 19, 2023, at 5:00 pm

Building(s) or Area(s) Affected:  Riverfront Parkway southbound lane

Scope:  Riverfront Parkway’s southbound lane at Millrace Drive will be shut down to install the base structure for a tower crane.

Services Impacted:  Riverfront Parkway, Knight Campus Building 1, Millrace Parking Garage, & buildings on Millrace Drive will be affected – See attached detour plan.

Work Performed By:  Hoffman Construction

ContactDenise Stewart, CPFM Owner’s Representative, 541-346-2280 or 541-335-1258

Current construction and impacts information can be found on the UO Maps site.

Image of detour for Riverfront Parkway lane closure 7-19-23

7/12/23 Riverfront Parkway Lane Closure Advisory

Begin:  Wednesday, July 12, 2023, at 6:00 am

End:      Wednesday, July 12, 2023, at 5:00 pm

Building(s) or Area(s) Affected:  Riverfront Parkway southbound lane

Scope:  Riverfront Parkway’s southbound lane at Millrace Drive will be shut down to remove large drilling equipment from the Knight Campus 2 site.

Services Impacted:  Riverfront Parkway, Knight Campus Building 1, Millrace Parking Garage & buildings on Millrace Drive will be affected – See attached detour plan.

Work Performed By:  Hoffman Construction

ContactDenise Stewart, CPFM Owner’s Representative, 541-346-2280 or 541-335-1258

Current construction and impacts information can be found on the UO Maps site.

Map of Riverfront Parkway Closure Detour 7-12-23