Streisinger 2nd Floor Emergency RO Water Shutdown 6/17

UPDATE 6/17 at 3:56 pm: The RO water has been restored.

Begin:  Wednesday, June 17th, 2020 at 3:30 pm

End:      Wednesday, June 17th, 2020 at 5:00 pm

Building(s) or Area(s) Impacted:  Streisinger 2nd Floor

Scope:  We need to shut down the reverse osmosis water to the second floor to make emergency repairs.

Services Impacted:  RO water to the 2nd floor

Work Performed By:   CPFM Facilities Plumbing Support

Contact:  Ken Straw, CPFM Facilities Mechanical & Plumbing Shop Manager, 541-346-5406

Klamath RO Water Shutdown 5/27/20

Begin:  Wednesday, May 27th, 2020 at 6:00 am

End:      Wednesday, May 27th, 2020 at 11:00 am

Building(s) or Area(s) Impacted:  Klamath Hall

Scope:  An RO water line on level 3 needs rerouted to accommodate new work.

Services Impacted:  This will affect the RO water in the whole building.

Work Performed By:   Lease Crutcher Lewis

ContactDenise Stewart, CPFM Owner’s Representative, 541-346-2280 or 541-335-1258

Klamath Hall Utilities Shutdown 4/8/2020

Begin:  Wednesday, April 8th, 2020 at 6:00 am

End:      Wednesday, April 8th, 2020 at 4:00 pm

Building or Area Impacted:  Klamath Hall

Scope:  Final utility connections need to be made for Klamath 3rd floor South.

Services Impacted:

  • Nitrogen, Heating water, Heating Water return, Industrial Cold water, Industrial Hot Water, Hot Water Return and Chilled water will be offline to the 3rd floor south.
  • RO water will be offline to the whole building.

Work Performed By:   Lease Crutcher Lewis

ContactDenise Stewart, CPFM Owner’s Representative, 541-346-2280 or 541-335-1258

 

Klamath Hall 3rd Floor RO and Safety Shower Station Shutdown 2/13/2020

UPDATE:  The only safety shower impacted will be room 345.  The 3rd floor RO will still be offline from 9:00 to 3:00 as planned.

 

Begin:   Thursday, February 13th, 2020 at 9:00 am

End:      Thursday, February 13th, 2020 at 3:00 pm

Building or Area Impacted:  Klamath Hall

Scope:  Klamath 3rd floor renovation needs to reroute and isolate the RO water and safety showers stations.

Services Impacted:  RO will be offline on the 3rd floor and the only safety shower impacted will be in room 345.

Work Performed By:  Lease Crutcher Lewis

ContactDenise Stewart, CPFM Owner’s Representative, 541-346-2280 or 541-335-1258

Willamette Hall Basement RO Water Shutdown 11/4/19 – 11/5/19

On Monday evening, November 4th at 10:30 pm, until Tuesday morning, November 5th at 6:30 am, the basement RO water will not be available.  This will allow contractors to further isolate the RO water for a basement lab renovation.

This will affect the basement level only.

Work will be performed by Lease Crutcher Lewis.

For questions or concerns, please contact Denise Stewart at 541-335-1258 or dstewart@uoregon.edu.

 

 

Willamette Hall RO Water and Gas Shutdown 10/16/19 – 10/17/19

On Wednesday evening, October 16th at 10:30 pm to Thursday morning, October 17th at 4:30 am, the RO water in the basement will be shutdown, plus the natural gas, for the whole building, will be offline.  This will allow the contractor to isolate the RO water and natural gas utilities for renovation in the basement.

Work will be performed by Lease Crutcher Lewis.

For questions or concerns, please contact Denise Stewart at 541-335-1258 or dstewart@uoregon.edu.

 

[Ongoing Updates] Information Regarding LISB Water Leak Mitigation

Update 11/2: Drywall work is nearing completion in LISB 200. The final coat of joint compound is expected to be applied today. Depending on dry-times, it may be necessary for a Facilities Technician to come into the space on Saturday 11/3 to keep the project on schedule for its completion date. Paint and primer are expected to be completed by the end of the working day on Monday 11/5. Additional cleanup time and removal of equipment will likely spill over into the day on Tuesday 11/6.

 

Update 10/31: Work in LISB 200 is under way. Dust containment and negative pressure air-purifiers are in place and functioning. Sheetrock work is progressing and is approximately fifty percent complete.

 

From: LeAnna Pitts On Behalf Of CPFM Work Control Center
Sent: Monday, October 29, 2018 3:31 PM
To: CPFM Work Control Center <workcontrolcenter@uoregon.edu>
Cc: Adam Jones <asjones@uoregon.edu>; Cathy Soutar <csoutar@uoregon.edu>; ‘Amy Salmore’ <amymc@uoregon.edu>
Subject: [Fourth Update] Information Regarding LISB Water Leak Mitigation

Building Occupants,

EHS has evaluated drying progress in the remaining two areas of LISB and can provide the following updates:

201 & 204 – Demising wall is still wet and is showing little drying progress. EHS and CPFM have determined that our best course of action is to demolish and replace affected finishes. The current plan will include constructing a dust control containment and air filters, and all removal and replacement work occur with these controls present. Our intent is to reduce dust emissions from this work to the lowest practicable level. The current plan is to wrap up work within 1 – 2 weeks. We believe labs should be able to remain largely functional during this period, with the loudest tasks being completed off-hours.

Please feel free to contact me as needed.

Thank you,
__________________________________
Adam S. Jones
Building Environmental Sciences Team Manager
http://ehs.uoregon.edu
Safety & Risk Services | University of Oregon
1260 University of Oregon | Eugene, OR 97403-1260
Office: 541.346.8397| Fax: 541.346.7008
Mobile: 541.852.5685|

 

From: LeAnna Pitts On Behalf Of CPFM Work Control Center
Sent: Monday, October 29, 2018 2:21 PM
To: CPFM Work Control Center <workcontrolcenter@uoregon.edu>
Cc: Adam Jones <asjones@uoregon.edu>; ‘Amy Salmore’ <amymc@uoregon.edu>; Cathy Soutar <csoutar@uoregon.edu>
Subject: [Third Update] Information Regarding LISB Water Leak Mitigation

Building Occupants,

EHS has evaluated drying progress in the remaining two areas of LISB and can provide the following updates:

303 & 304 – Demising wall is dry. Servpro will remove equipment today. CPFM will make repairs and return the space to normal service in the coming week.

Please feel free to contact me as needed.

Thanks,
__________________________________
Adam S. Jones
Building Environmental Sciences Team Manager
http://ehs.uoregon.edu
Safety & Risk Services | University of Oregon
1260 University of Oregon | Eugene, OR 97403-1260
Office: 541.346.8397| Fax: 541.346.7008
Mobile: 541.852.5685|

 

From: LeAnna Pitts On Behalf Of CPFM Work Control Center
Sent: Friday, October 26, 2018 4:39 PM
To: CPFM Work Control Center <workcontrolcenter@uoregon.edu>
Cc: Adam Jones <asjones@uoregon.edu>; ‘Amy Salmore’ <amymc@uoregon.edu>; Cathy Soutar <csoutar@uoregon.edu>; Flo Hoskinson <flo@uoregon.edu>
Subject: [Second Update] Information Regarding LISB Water Leak Mitigation

Building Occupants,

EHS has evaluated drying progress and can provide the following updates:

Rooms 201B, 303C, 403, 405, 407, & 409 – All drying was successful and is complete. Servpro removed equipment today.

303, 304, & 307 – All casework is dry. Servpro removed equipment today.

303 & 304 – Demising wall is still wet, but is showing progress. Equipment will remain over the weekend and EHS will recheck on Monday, 10-29-2018. We are hopeful that this will dry by then.

201 & 204 – Demising wall is still wet and is showing little progress. Equipment will remain over the weekend and EHS will recheck on Monday, 10-29-2018. Some demolition may be necessary.

CPFM will start reconstruction on Monday where they can. At this point, we think that most reconstruction will be completed by Friday next week. That being said, the second floor wall repairs may take longer depending on the final scope. We will be able to provide an update on Monday.

Thank you,
__________________________________
Adam S. Jones
Building Environmental Sciences Team Manager
http://ehs.uoregon.edu
Safety & Risk Services | University of Oregon
1260 University of Oregon | Eugene, OR 97403-1260
Office: 541.346.8397| Fax: 541.346.7008
Mobile: 541.852.5685|

 

From: LeAnna Pitts On Behalf Of CPFM Work Control Center
Sent: Wednesday, October 24, 2018 4:30 PM
To: CPFM Work Control Center <workcontrolcenter@uoregon.edu>
Cc: Adam Jones <asjones@uoregon.edu>; ‘Amy Salmore’ <amymc@uoregon.edu>; Cathy Soutar <csoutar@uoregon.edu>; Flo Hoskinson <flo@uoregon.edu>
Subject: Update: Information Regarding LISB Water Leak Mitigation

Building Occupants,

The mitigation associated with the LISB water intrusion from October 23, 2018 is anticipated to take between 1 – 2 weeks to be completed.

Please feel free to contact EHS if you have any questions.

Thank you,
__________________________________
Adam S. Jones
Building Environmental Sciences Team Manager
http://ehs.uoregon.edu
Safety & Risk Services | University of Oregon
1260 University of Oregon | Eugene, OR 97403-1260
Office: 541.346.8397| Fax: 541.346.7008
Mobile: 541.852.5685|

Sent: Tuesday, October 23, 2018 3:52 PM
To: CPFM Work Control Center <workcontrolcenter@uoregon.edu>
Cc: Adam Jones <asjones@uoregon.edu>; ‘Amy Salmore’ <amymc@uoregon.edu>; Cathy Soutar <csoutar@uoregon.edu>; Flo Hoskinson <flo@uoregon.edu>
Subject: Information Regarding LISB Water Leak Mitigation

In the early hours of 10/23, a leak occurred within the RO system.

 

Building Occupants,

In the early hours of October 23, 2018, a water leak occurred within the RO system in LISB room 405. The leak impacted several spaces on the 2nd, 3rd, and 4th floors of the building. Thanks to the quick work of CPFM staff, the impacts were contained and limited to some cabinetry and gypsum board wall finishes in the rooms listed below.

201, 201B, 204, 303, 303C, 304, 307, 403, 405, 407, 409

The University has retained a mitigation contractor, Servpro, to provide mitigation services for all of the affected spaces. Our current mitigation strategy will be to dry out finishes in place, with minimal demolition. This will include the use of dehumidification equipment and large fans strategically placed throughout affected areas. The equipment will generate heat and a significant amount of noise. It is imperative that it be left running and not tampered with, or mitigation efforts will not be successful. EHS will oversee the dry out phase of the mitigation. Once mitigation has been completed, the space will be reassembled by CPFM staff. Servpro will be setting up mitigation equipment in fourth-floor spaces this afternoon (October 23, 2018), and second and third floor spaces tomorrow (October 24, 2018).

Please feel free to contact me if you have any questions or concerns about the mitigation phase of this incident. If any non-building related items were damaged as a result of this incident, contact Risk Management at 541-346-8316.
__________________________________
Adam S. Jones
Building Environmental Sciences Team Manager
http://ehs.uoregon.edu

4/9/18: Klamath, Onyx Bridge, Pacific, Streisinger, Willamette Emergency RO Water Shutdown

Update:  RO water pipe has been repaired.

Building Users,

We are having to do an emergency repair to the RO (reverse osmosis) water line.  Since the RO water is pulled from tanks, we are hoping this will not affect the building users prior to the problem being corrected.  We will let you know when the repairs have been completed.

Campus Planning and Facilities Management crews will be performing the work.

For questions or concerns about how this may impact your area, contact David Ward, Campus Planning and Facilities Management (CPFM) Building Systems Associate Director at 346-2303.

 

9/20/17: Onyx Bridge RO Water Shutdown

Building Occupants,

On September 20, 2017, from 5:00 am – 7:00 am the RO Water will be temporarily shut down in Onyx Bridge to allow for plumbing demolition in Onyx 270.  This will impact the entire building.  Contractors Harvey and Price are performing the work.

For questions or concerns, please contact CPFM Design and Construction Project Manager Nick Pritchard 541-346-9139.

08/03/17: Onyx Bridge and Pacific Hall RO System Outage

Building Occupants,

On Thursday, August 3, 2017,  from 8:00 am – 4:00 pm the RO Water that services Onyx Bridge and Pacific Hall will be temporarily shut down while crews install a new value in the penthouse in Onyx Bridge.  This allows Onyx Bridge and Pacific Hall to be isolated from each other so lines can be capped off as part of the Onyx Bridge second floor remodel project.

For questions or concerns, contact CPFM Facilities Services Zone B Maintenance Manager Bruce Budzik at 346-8834.

7/21/17: Onyx Bridge R/O Water Shutdown

Building Occupants,

On Friday, July 21st, from 8:00 am to 12:00 noon, R/O water will be shut down in Onyx Bridge.

This is for the demolition of connections for the second floor remodel project. No other buildings or utilities will be affected.

For questions or concerns about how this may impact your area, contact Bruce Budzik, Campus Planning and Facilities Management (CPFM) Zone B Maintenance Manager at 346-8834.

Notice: Pacific Hall Construction Impacts to Lab Gas, Drain Lines, Compressed Air, RO System and Water Starting 6/21/17 Ending 07/07/17

Building Occupants,

As part of the Pacific Hall Project, the following impacts will be happening starting June 21, 2017 and running through July 7, 2017.

 

Starting June 21, 2017, at 7:00 am

Ending June 22, 2017, by 4:00 pm

Scope: Lab gas will be disconnected temporarily to allow for construction activities.

 

Starting June 22, 2017, at 7:00 am

Ending June 23, 2017, by 4:00 pm

Scope: Lab sink drain lines need to be temporarily disconnected and configured to accommodate construction activities.

 

Starting June 23, 2017, at 7:00 am

Ending June 23, 2017, by 4:00 pm

Scope: Compressed air will be disconnected to allow construction activities.

 

Starting June 26, 2017, 7:00 am

Ending June 29, 2017, by 4:00 pm

Scope: RO water will temporarily be disconnected to allow for construction activities.

 

Starting July 5, 2017, at 7:00 am

Ending July 7, 2017, by 4:00 pm

Scope: The chilled and hot water will be temporarily disconnected to allow for construction activities.

 

For questions regarding these impacts contact CPFM Design and Construction Nick Pritchard at 612-803-0664 or Jen Miley at 541-346-1530.

 

5/20/17: Sidewalk closures affecting several buildings for tree trimming

Building Occupants,

On Saturday, May 20th from 8:00am until 4:00pm access to the south entrance to Lawrence Hall will be closed for tree trimming by Sperry Tree Care. The walkway between Lawrence and Allen will be closed. Loud noise will be intermittent as work is carried out affecting primarily Allen Hall, Lawrence Hall, and Pacific Hall.

The Lawrence Hall alley and the walkways connecting to it will be closed or restricted as will access to the south entrance to Lawrence Hall.

For questions or concerns please contact Kevin Farthing  Zone D Maintenance Manager at 541-346-2857.