Klamath Hall Utilities Shutdown 4/8/2020

Begin:  Wednesday, April 8th, 2020 at 6:00 am

End:      Wednesday, April 8th, 2020 at 4:00 pm

Building or Area Impacted:  Klamath Hall

Scope:  Final utility connections need to be made for Klamath 3rd floor South.

Services Impacted:

  • Nitrogen, Heating water, Heating Water return, Industrial Cold water, Industrial Hot Water, Hot Water Return and Chilled water will be offline to the 3rd floor south.
  • RO water will be offline to the whole building.

Work Performed By:   Lease Crutcher Lewis

ContactDenise Stewart, CPFM Owner’s Representative, 541-346-2280 or 541-335-1258