6/28/24 Huestis Hall Room 104 Gas Supply Shutdown

Begin:  Friday, June 28, 2024, at 7:00 am

End:     Friday, June 28, 2024, at 9:00 am

Building(s) or Area(s) Affected:  Huestis Hall Rm 104

Scope:  Gas service to room lab prep will be offline to replace the solenoid.

Services Impacted:  The gas supply will be shut down in room 104 during this time.

Work Performed By:  JH Kelly

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880

Current construction and impacts information can be found on the UO Maps site.

Posted in Gas

8/23/23 – 8/24/23 Fine Arts A, B, & C and Millrace Studio 2 Natural Gas Shutdown

Begin:  Wednesday, August 23, 2023, at 6:00 am

End:      Thursday, August 24, 2023, at 5:00 pm

Building(s) or Area(s) Affected:  Fine Arts A, B, C, and Millrace Studio 2.

Scope:  The natural gas will be shut down for NW Natural to reroute natural gas piping.

Services Impacted:  Natural gas will not be available during this time.

Work Performed By:  NW Natural

ContactDenise Stewart, CPFM Owner’s Representative, 541-346-2280 or 541-335-1258

Current construction and impacts information can be found on the UO Maps site.

Image of Fine Arts A, B, & C plus Millrace Studio 2

6/09/23 Fuel Island Routine Maintenance Shutdown

Begin:  Friday, June 9, 2023, at 7:00 am

End:      Friday, June 9, 2023, at 4:00 pm

Building(s) or Area(s) Affected:  Fuel Pumps in Campus Planning and Facilities Management Compound

Scope:  The fuel island at CPFM will be shut down for regular maintenance.

Services Impacted:  The fuel pumps will be offline during this time.

ContactAdam Jones, SRS Buildings Sciences Manager, 541-346-8397

Current construction and impacts information can be found on the UO Maps site.

Image of CPFM Compound

3/10/23 CPFM Compound Propane Tank Installation Advisory

Begin:  Friday, March 10, 2023

End:      Friday, March 10, 2023

Building(s) or Area(s) Affected:  CPFM Compound

Scope:  Facilities Services will be installing a 500 gallon propane tank and line, in the parking lot are north of Bldg. 130 (CPFM Warehouse/Stores) and east of Bldg. 129 (Paint Quonset) this Friday. The tank will be located in the NW corner of the newly paved parking area.

Services Impacted:

  • No impacts to Building 130 CPFM Warehouse/Stores occupants are expected.
  • Occupants of Building 129 Paint Quonset will have modified building access because of the open trench.
  • The travel lane for vehicles and deliveries should not be affected, only temporary impacts to adjacent parking spaces. around the trench and tank location.

Work Performed By:  Amerigas

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Huestis Hall and Lokey Labs Natural Gas Shutdown 12/08/21

Begin:  Wednesday, December 8th, 2021 at 7:00 am

End:      Wednesday, December 8th, 2021 at 11:00 am

Building(s) or Area(s) Impacted:  Huestis Hall and Lokey Labs

Scope:  As part of the phase 1 Huestis Hall renovation project, natural gas services will be temporarily shut down.

Services Impacted:  Natural gas service to Huestis and Lokey Labs may be affected.

Work Performed By:  Mortenson Construction

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880

1715 Franklin Natural Gas Shutdown 12/1/21

UPDATE:
The natural gas has been restored.

 

Begin:  Wednesday, December 1st, 2021 at 7:00 am

End:      Wednesday, December 1st, 2021 at 3:00 pm

Building(s) or Area(s) Impacted:  1715 Franklin

Scope:  The natural gas meter is being replaced.

Services Impacted:  The HVAC heating and hot water will be offline on the first and second floors in the north portion of the building.

Work Performed By:  Northwest Natural Gas in conjunction with CPFM

ContactRichard Vaughan, CPFM Facilities Services Lead Worker-Refrigeration Mechanic, 541-346-2319

Klamath Hall Natural Gas Shutdown 3/26/2020

DATE REVISION:  New date of Thursday, March 26th, but same times

 

Begin:  Tuesday morning, March 24th, 2020 Thursday morning, March 26th, 2020 at 6:00 am

End:   Tuesday morning, March 24th, 2020 Thursday morning, March 26th, 2020 at 8:00 am

Building or Area Impacted:  Klamath Hall

Scope:  Natural gas will be offline while piping is modified within the third floor work area.

Services Impacted:  Natural gas for the entire building.

Extra Notes:  Work will be performed by Lease Crutcher Lewis.

ContactDenise Stewart, CPFM Owner’s Representative, 541-346-2280 or 541-335-1258

Klamath Hall Natural Gas Shutdown 12/16/19

Begin:   December 16, 2019 at 7:00 am

End:     December 16, 2019 at 3:30 pm

Scope:  Contractors need to safely remove a tree stump next to the Natural Gas meter and building connection. Natural Gas will be shutoff for the duration of the tree work.

Building Impacted:  Klamath Hall

Services Impacted:  Natural gas

Contact:  Denise Stewart, Owner’s Representative, 541-346-2280 or 541-335-1258

Willamette Hall RO Water and Gas Shutdown 10/16/19 – 10/17/19

On Wednesday evening, October 16th at 10:30 pm to Thursday morning, October 17th at 4:30 am, the RO water in the basement will be shutdown, plus the natural gas, for the whole building, will be offline.  This will allow the contractor to isolate the RO water and natural gas utilities for renovation in the basement.

Work will be performed by Lease Crutcher Lewis.

For questions or concerns, please contact Denise Stewart at 541-335-1258 or dstewart@uoregon.edu.

 

Moss Street Children’s Center Gas Meter Replacement 3/25 – 3/27

Facilities Liaisons,

NW Natural Gas and Brothers Plumbing will be onsite at Moss St. Children’s Center installing a new gas meter over spring break. The project will run from March 25 – March 27. EMU has reserved four parking spaces out front of the building allowing crews to complete repairs. All work is on the exterior of the building.

For questions or concerns, please contact:

EMU Building Superintendent
chadw@uoregon.edu
T-541-346-0692

Posted in Gas

Klamath Hall Natural Gas Shutdown 3/27

Facilities Liaisons,

As part of the third-floor renovation the contractor Lease Crutcher Lewis will be shutting down natural gas to Klamath Hall on March 27, at 7:00 pm with a restore time of 5:00 am on March 28. This is necessary while crews install valves to isolate the third floor from the rest of the building. This will be a building-wide natural gas shutdown.

For questions or concerns please contact CPFM Design and Construction Manager Denise Stewart at 541-335-1258.

Posted in Gas

Moss Street Children’s Center NW Natural Gas Shutdown 1/18

Building Occupants,

Northwest Natural gas detected a small leak in the gas line leading into the building. The gas has been shut off to the north side of the building until repairs can be made. This impacts hot water, kitchen appliances and heat in the building. EMU Facilities will be coordinating repair efforts.

For questions or concerns, please contact Chad Wells 541-346-0692 with EMU Facilities.

Posted in Gas

03/28/2017: Streisinger, Huestis, Willamette, and Lorry Lokey Labs Natural Gas Shutdown

Building Occupants,

On Tuesday, March 28th, 2017 Streisinger, Huestis, Willamette, and Lorry Lokey Labs will have a temporary Natural Gas Shutdown from 7:30 am – 8:30 am.  This work is necessary for a meter inspection.  Spring Break was selected to limit the impact to building occupants.

For questions or concerns about how this may affect your services contact Teri Jones, Project Systems Specialist, CPFM Design and Construction at 346-6859.

 

Posted in Gas

Notice: Huestis Natural Gas, Lab Air, RO Water, Potable Water and Heating Water Shutdown 2/9 and 2/10 from 6 pm – 7 am

Due to the installation of new isolation valves located in the SE building riser, the below services will be interrupted in Huestis for two consecutive nights of shut-downs from 6PM-7AM on February 9, 2017, and February 10, 2017.  Utilities will be turned on during the day.  Two nights have been scheduled for the work, although the contractors may be able to complete the work in 1 night depending on progress and condition of old lines.

Natural Gas – Building Wide

Laboratory Air – Building Wide

Reverse Osmosis Water – Building Wide

Potable Cold Water – Building Wide

Potable Hot Water – Building Wide

Heating Water – 3rd floor only

This is part of the third-floor lab renovations project.  This work was scheduled overnight to limit the impact to building occupants.

For questions or concerns contact Patrick Mucker at 541-346-8216.