12/16/24 Straub Hall East Elevator #2 Testing Shutdown

Begin:  Monday, December 16, 2024, at 9:00 am

End:      Monday, December 16, 2024, at 12:00 noon

Building(s) or Area(s) Affected:  Straub Hall

Scope:  East elevator #2 will be offline for testing.

Services Impacted:  The east elevator will be out of order until testing is done.  Please use the west elevator.

Special Instructions:  If you have concerns about accessing your workplace when elevator services are impacted, please contact your supervisor to find an appropriate accommodation.

Work Performed By:  Otis

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Overhead map view of the location of the east elevator in Straub Hall

12/11/24 – 12/20/24 Knight Library Restrooms 126 and 127 Intermittent Closures

Begin:  Wednesday, December 11, 2024

End:      Friday, December 20, 2024

Building(s) or Area(s) Affected:  Knight Library restrooms 126 and 127

Scope:  Knight Library restrooms 126 and 127 will have intermittent closures the week of December 9th and will be closed the week of December 16th for the installation of new partition walls. All other restrooms on the first floor of the library will remain open.

Services Impacted:

  • Restrooms 126 and 127 will be closed intermittently.
  • The closest restrooms are room 116 and room 120 which are near the front Circulation desk – see diagram below.

Work Performed By:  CPFM Facilities and HD Supply

ContactJanell Cottam, CPFM Owner’s Representative, 541-346-7536

Current construction and impacts information can be found on the UO Maps site.

Overhead map view of Knight Library's 1st floor showing the optional restroom locations during work on restrooms 126 and 127 12/11/24 -12/20/24

12/19/24 – 12/27/24 Campus Mandatory State Elevator Testing

UPDATE:
Due to a scheduling issue, Knight Library #1 testing will happen on Thursday, Dec. 19th, and EC Cares testing will take place on Friday, Dec. 20th.

 

Begin:  Thursday, December 19, 2024

End:      Friday, December 27, 2024

Building(s) or Area(s) Affected:  Millrace 3, CPFM Warehouse, Lewis Integrative Science Building, 1500 W. 12th, Knight Library, Bean Hall, Columbia Hall, Condon Hall, McKenzie Hall, Hamilton Kitchen, Hendricks Hall, Early Hall, Knight Law School, Oregon Hall, Baker Center, Rainier Building, Carson Hall, Jordon Schnitzer Museum of Art

Scope:  Rupture valves tests will be performed on 2-3 elevators per day.  Only one elevator will be taken offline at a time. (See schedule below.)

Services Impacted:  Each unit will be out of service during the test for approximately 2-3 hours.

Special Instructions:  If you have concerns about accessing your workplace when elevator services are impacted, please contact your supervisor to find an appropriate accommodation.

Thursday, December 19, 2024
Millrace 3
CPFM Warehouse (Bldg. 130)
Lewis Integrative Science Building #2 North
EC Cares (1500 W. 12th)   Knight Library #1

Friday, December 20, 2024
Knight Library #1   EC Cares (1500 W. 12th)
Bean Hall
Columbia Hall
Condon Hall

Monday, December 23, 2024
McKenzie Hall
Hamilton Kitchen
Hendricks Hall
Earl Hall

Tuesday, December 24, 2024
Knight Law School #1
Knight Law School #2
Knight Law School #3
Oregon Hall – Service/Freight #3

Thursday, December 26, 2024
Baker Downtown Center – Freight
Rainier Building
Carson Hall – Kitchen Freight
Cascade Hall

Friday, December 27, 2024
Jordan Schnitzer Museum of Art – Passenger
Jordan Schnitzer Museum of Art – Freight

Work Performed By:  CPFM Facilities and Otis Elevator

Contact:  Work Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Overhead map view of the buildings impacted by the elevator rupture valve tests 12/19/24 - 12/27/24

11/18/24 – 11/19/24 HEDCO South Elevator Emergency Shutdown

Begin:  Monday, November 18, 2024 – effective immediately

End:      Tuesday, November 19, 2024 – tomorrow morning

Building(s) or Area(s) Affected:  HEDCO South Elevator

Scope:  The HEDCO south elevator is currently offline for emergency repairs.  A technician will make the needed repairs tomorrow morning.  A notice will be sent when service has been restored.

Services Impacted:  The elevator is out of order until further notice.  Please use the NE elevator.

Special Instructions:  If you have concerns about accessing your workplace when elevator services are impacted, please contact your supervisor to find an appropriate accommodation.

Work Performed By:  Otis

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Overhead map view of HEDCO South Elevator

11/15/24 – 11/20/24 Miller Theatre Elevator Emergency Shutdown

Begin:  Friday, November 15, 2024 – effective immediately

End:      Wednesday, November 20, 2024 – end of day

Building(s) or Area(s) Affected:  Miller Theatre

Scope:  The Miller Theatre elevator is currently offline for emergency repairs.  Parts are expected to arrive on Wednesday, Nov. 20th.  A notice will be sent when service has been restored.

Services Impacted:  The elevator is out of order until further notice.

Special Instructions:  If you have concerns about accessing your workplace when elevator services are impacted, please contact your supervisor to find an appropriate accommodation.

Work Performed By:  Otis

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Overhead map view of the location of the elevator in Miller Theatre

11/18/24 – June 2025 – Knight Campus Buildings 1 and 2 Skybridge Work Advisory

Begin:  Monday, November 18, 2024

End:      June 2025

Building(s) or Area(s) Affected:  Knight Campus Building 1, North entry – See attached map.

Scope:  Construction of a new skybridge connecting Knight Campus Buildings 1 and 2 requires closure of the north entry of Building 1 and closure of the pedestrian boardwalk between Building 1 and the Millrace. Clear pathways for emergency egress will be maintained.

Services Impacted:  Pedestrians detour path is south of Building 1 along Franklin Blvd

Work Performed By:  Hoffman Construction

ContactDenise Stewart, CPFM Owner’s Representative, 541-346-2280 or 541-335-1258

Current construction and impacts information can be found on the UO Maps site.

241118_Knight Campus 2_Skybridge Construction Closure Map

Map of Knight Campus 2 Skybridge Construction Closure

11/06/24 – 11/07/24 Lawrence Hall North Wheelchair Lift Emergency Shutdown

Begin:  Wednesday, November 6, 2024 – effective immediately

End:      Thursday, November 7, 2024 – late morning

Building(s) or Area(s) Affected:  Lawrence Hall North Wheelchair Lift (by room #274)

Scope:  The north wheelchair lift by room #274 is currently out of order for emergency repairs.  Parts are expected tomorrow morning.  An update will be sent when the lift has been restored to service.

Services Impacted:  The north wheelchair lift is offline.

Special Instructions:  If you have concerns about accessing your workplace when elevator services are impacted, please contact your supervisor to find an appropriate accommodation.

Work Performed By:  Otis Elevator

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Overhead map view of the location of the north wheelchair lift in Lawrence Hall

11/26/24 – 12/02/24 Zebrafish International Resource Center and the CPFM Administration Quonset Sidewalk Closure

UPDATE:

The artist will be here tomorrow and expects to be done by December 2nd.

UPDATE:
The installation has been postponed due to the weather forecast for this week.  The new date is yet to be determined.

BeginWednesday, November 20, 2024, at 12:00 noon   Tuesday, November 25, 2024, at 7:00 am

End:      Friday, November 29, 2024, at 5:00 pm   Monday, December 2, 2024, at 12:00 noon

Building(s) or Area(s) Affected:  Between Zebrafish International Resource Center and the CPFM Administration Quonset

Scope:  The sidewalk between Zebrafish International Resource Center and the CPFM Administration Quonset will be closed to install artwork.

Services Impacted:  Sidewalk will be unavailable during this time.  Pease use an alternate route.

Work Performed By:  Pete Goldlust

ContactColin Brennan, CPFM Owner’s Representative, 541-346-8242 or 541-654-2972

Current construction and impacts information can be found on the UO Maps site.

Overhead map view of sidewalk area closed between ZIRC and CPFM Admin Quonset 11/20/24 - 11/29/24

10/28/24 – 12/06/24 Straub Green Landscaping and Irrigation Work Advisory

Begin:  Monday, October 28, 2024, at 7:00 am

End:      Friday, December 6, 2024, at 4:00 pm

Building(s) or Area(s) Affected:  Straub Green

Scope:  Work will be performed in the Straub Green, in front of Straub Hall, to replace the irrigation system and upgrade the landscaping. Work will be phased throughout the project timeline. Full landscape development is not expected to be complete until the end of the Spring season.

Services Impacted:

  • Fencing and signage will be provided to mark out which areas and sidewalks will be closed throughout the project.
  • Sidewalks around the perimeter will not be closed.
  • Noise can be expected during this time.

Work Performed By:  Rexius

ContactWaymon Banks, CPFM Owner’s Representative, 541-346-0196

Current construction and impacts information can be found on the UO Maps site.

Overhead map image of Straub Green and landscaping activity borders for 10/28/24 - 12/06/24

10/30/24 Knight Law, Museum of Natural and Cultural History, Many Nations Longhouse, and Vivian Olum Child Development Center Electrical Shutdown

Begin:  Wednesday, October 30, 2024, at 6:00 am

End:      Wednesday, October 30, 2024, at 8:00 am

Building(s) or Area(s) Affected:  Knight Law, Museum of Natural and Cultural History, Many Nations Longhouse, and Vivian Olum Child Development Center.

Scope:  To improve campus resilience, new electrical feeders and switches are being connected/installed on campus. And as part of our current project, a short building outage is required to make the necessary connections.

Services Impacted:  All building power will be unavailable during this outage.  Accordingly, please make sure to take all necessary preparations such as: unplugging computers/printers, making sure refrigerated/frozen items are accommodated for, how to enter building(s) while card readers are offline, etc.

Special Instructions:  Please shut down and unplug all multi-function copier devices as well as any printers during scheduled power outages. The software on these machines can be negatively affected due to the power surge when the power is turned back on.  A power surge can corrupt the clone files in the machines and change preconfigured settings.  For questions, please contact Kati Kronholm at 541-346-5370 or katik@uoregon.edu.  For non-copier questions, please reach out to the contact person listed below.

Work Performed By:  EC Electric

ContactDamon Rutherford, CPFM D&C Owner’s Representative, 541-346-8285

Current construction and impacts information can be found on the UO Maps site.

Overhead map view of Knight Law, Museum of Natural and Cultural History, Many Nations Longhouse, and Vivian Olum Child Development Center

10/04/24 – 10/09/24 Prince Lucien Campbell (PLC) North Elevator Emergency Shutdown

UPDATE:
The elevator has been restored to service.

 

Begin:  Friday, October 4, 2024 – effective immediately

End:      Unknown   Wednesday, October 9, 2024

Building(s) or Area(s) Affected:   Prince Lucien Campbell (PLC)

Scope:  The North elevator E177 is currently offline.  The Otis technician is working on it.  An update will be sent when it has been restored to service.

Services Impacted:  The North elevator is out of service however the South Elevator is still in service for an alternate route

Special Instructions:  If you have concerns about accessing your workplace when elevator services are impacted, please contact your supervisor to find an appropriate accommodation.

Work Performed By:  Otis

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Image of Prince Lucien Campbell

10/03/24 – 10/22/24 Lewis Integrative Science Building South Elevator #1 Emergency Shutdown

UPDATE 10/22/24:        
The new board has been installed and the elevator has been returned to service.

 

UPDATE 10/17/24:        
We are still waiting for a new part to replace the older obsolete one.  An update will be sent as soon as we know more.  Please use the Huestis elevator in the meantime.

 

Begin:  Thursday, October 3, 2024 – Effective immediately

End:      Unknown   Tuesday, October 22, 2024

Building(s) or Area(s) Affected:  Lewis Integrative Science Building

Scope:  South elevator #1 is currently offline for emergency repairs. An Otis technician and contractor are assessing it.  A notice will be sent when service has been restored.

Services Impacted:  The elevator is out of order until further notice.  Please use the elevator in Huestis.

Special Instructions:  If you have concerns about accessing your workplace when elevator services are impacted, please contact your supervisor to find an appropriate accommodation.

Work Performed By:  Otis

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Lewis Integrative Science Building south elevator #1

9/26/24 – Unknown – Prince Lucien Campbell North Elevator #1 Emergency Shutdown

Begin:  Thursday, September 26, 2024 – Effective immediately

End:      Unknown

Building(s) or Area(s) Affected:  Prince Lucien Campbell

Scope:  The north elevator #1 is currently offline and an Otis technician, along with an MCE tech, are assessing the intermittent issues it has been experiencing.  A notice will be sent when service has been restored.

Services Impacted:  The elevator is out of order until further notice.  Please use the south elevator during this time.

Special Instructions:  If you have concerns about accessing your workplace when elevator services are impacted, please contact your supervisor to find an appropriate accommodation.

Work Performed By:  Otis and MCE Tech Support

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Overhead map view of Prince Lucien Campbell north elevator #1

9/26/24 Lewis Integrative Science Building North Elevator #2 Emergency Shutdown

UPDATE:
Please disregard.  The elevator was already repaired earlier today.

 

Begin:  Thursday, September 26, 2024 – Effective immediately

End:      Unknown

Building(s) or Area(s) Affected:  Lewis Integrative Science Building

Scope:  North elevator #2 is currently offline and an Otis technician and contractor are assessing it.  A notice will be sent when service has been restored.

Services Impacted:  The elevator is out-of-order until further notice.  Please use the south elevator during this time.

Special Instructions:  If you have concerns about accessing your workplace when elevator services are impacted, please contact your supervisor to find an appropriate accommodation.

Work Performed By:  Otis

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Overhead map view of elevator #2 in the Lewis Integrative Science Building

9/22/24 – 11/07/24 Lokey Education (Bldg. 007) Elevator #3 Emergency Shutdown

UPDATE 11/07/24:        
The elevator has been repaired and returned to service.

 

UPDATE 10/22/24:        
We are still waiting for parts to arrive.  An update will be sent as soon as we know more.

 

Begin:  Sunday, September 22, 2024 – evening

End:      Unknown   Thursday, November 7, 2024

Building(s) or Area(s) Affected:  Lokey Education (Building 007)

Scope:  Elevator #3 is currently offline due to mechanical issues.  A notice will be sent when it has been restored to service.

Services Impacted:  The elevator has been shut down.

Special Instructions:  If you have concerns about accessing your workplace when elevator services are impacted, please contact your supervisor to find an appropriate accommodation.

Work Performed By:  Otis Elevator

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Overhead image of Lokey Education and location of elevator #3

9/13/24 Gallery Way Paving and Odor Advisory

UPDATE:
The coming rain has postponed the start of this paving project to Friday, September 13th.  The duration is now expected to be only one day

 

BeginThursday, September 12     Friday, September 13, 2024

End:      Friday, September 13, 2024

Building(s) or Area(s) Affected:  Gallery Way, Urban Farm, Millrace Studios, Fine Arts Studios & Woodshop

Scope:  New asphalt paving placement to repair surfaces at new tunnel construction.

Services Impacted:

  • Closure of Gallery Way and alleyway between Fine Arts C & Woodshop.
  • There will be odor during asphalt work. Keep operable windows closed in buildings adjacent to the work.
  • Pedestrian and bicycle traffic will be rerouted during this time.

Work Performed By:  Hoffman Construction

ContactDenise Stewart, CPFM Owner’s Representative, 541-346-2280 or 541-335-1258

Current construction and impacts information can be found on the UO Maps site.

Overhead map view of paving project location on Gallery Way 9/12/24 - 9/13/24

9/09/24 – 9/20/24 Lokey Education Sidewalk Replacement Advisory

UPDATE:
The concrete was poured today and will be drying over the weekend.  It is currently sectioned off to prevent accidental use.
The contractor will be back on Monday to remove the forms, opening it back up to pedestrian and bicycle traffic.  However, the concrete needs to continue to cure until next Friday, Sept. 20th, before vehicle/cart traffic will be able to use it.  Signage will be posted on Monday to this effect.

 

Begin:  Monday, September 9, 2024

End:      Friday, September 13 20, 2024

Building(s) or Area(s) Affected:  Sidewalk directly east of Lokey Education

Scope:  Delta Sand & Gravel will be replacing the sidewalk on the east side of Lokey Education (see schedule below).

Monday 9/9 – cut concrete

Tuesday 9/10 – remove cut panels

Wednesday 9/11 – create forms

Thursday 9/12 – create forms

Friday 9/13 – pour new concrete

Services Impacted:  The sidewalk will be unavailable during this time.

Special Instructions:  Please use on using a different route.

Work Performed By: Delta Sand & Gravel

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Overhead aerial view of the sidewalk on the east side of Lokey Education that will be replaced 9/9/24 - 9/13/24

8/28/24 – 10/01/24 Tykeson Hall Elevator Emergency Shutdown

UPDATE:
The elevator has been restored to service.

 

UPDATE 9/23/24:
Until the elevator has been restored to service, Solid Waste Services has requested that all recycling be brought down to the 1st floor collection area.  Thank you.

 

UPDATE 9/16/24:
Parts are expected to arrive the week of October 14th.  An update will be sent when it has been restored to service.

 

UPDATE 8/29/24:
A field engineer will be arriving tomorrow to work on the elevator.  Parts are being ordered, but it is unknown at this time how long it will be down.  An update will be sent when it has been restored to service.

If you have concerns about accessing your workplace when elevator services are impacted, please contact your supervisor to find an appropriate accommodation.

 

Begin:  Wednesday, August 28, 2024 – effective immediately

End:      Unknown  Tuesday, October 1, 2024

Building(s) or Area(s) Affected:  Tykeson Hall

Scope:  The elevator encountered some issues during the testing this morning and is currently offline.  The Otis technician is working on it.  An update will be sent when it has been restored to service.

Services Impacted:  The elevator is out of service.

Special Instructions:  If you have concerns about accessing your workplace when elevator services are impacted, please contact your supervisor to find an appropriate accommodation.

Work Performed By:  Otis

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Overhead map view of the location of the elevator in Tykeson Hall

8/19/24 – 8/27/24 Campus Elevators Traction Full Load Testing Shutdown

Begin:  Monday, August 19, 2024

End:      Tuesday, August 27, 2024

Building(s) or Area(s) Affected:  Clinical Services Building, Carson Hall, Tykeson Hall, Barnhart Hall, Hatfield-Dowlin Complex, Onyx Bridge, Oregon Hall, and Lewis Integrative Science Building #1

Scope:  Traction full load tests will be performed on 2-3 elevators per day.  (See schedule below.)

Services Impacted:  Each unit will be out of service during the test for approximately 2-3 hours.  Only one elevator will be taken out of service at a time.

Special Instructions:  If you have concerns about accessing your workplace when elevator services are impacted, please contact your supervisor to find an appropriate accommodation.

Monday, August 19, 2024
Clinical Services Building

Tuesday, August 20, 2024
Carson Hall
Tykeson Hall

Wednesday, August 21, 2024
Barnhart Hall #1
Barnhart Hall #2

Thursday, August 22, 2024
Hatfield Dowlin Complex
Hatfield Dowlin Complex

Friday, August 23, 2024
Onyx Bridge – West
Onyx Bridge – East

Monday, August 26, 2024
Oregon Hall #1 West
Oregon Hall #2 East

Tuesday, August 27, 2024
Lewis Integrative Science #1 South

Work Performed By:  CPFM Facilities and Otis Elevator

Contact:  Work Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Overhead map view of buildings affected by the elevator rupture valve testing 8/19/24 - 8/27/24

7/29/24 – 8/02/24 Campus Elevators Rupture Valve Tests Shutdown for Week of 7/29/24

UPDATE:
Due to a scheduling conflict, Knight Law testing will now take place on Friday and Lillis testing will happen on Monday.

 

Begin:  Monday, July 29, 2024

End:      Friday, August 2, 2024

Building(s) or Area(s) Affected:  Knight Law School, University Health Services, Student Recreation Center, Living Learning Center North and South, Price Science Commons, Thompson University Center, Global Scholars, Riley Hall, Straub Hall, Susan Campbell, Lillis Hall

Scope:  Rupture valves tests will be performed on 2-3 elevators per day. Only one elevator will be taken offline at a time. (See schedule below.)

Services Impacted:  Each unit will be out of service during the test for approximately 2-3 hours.

Special Instructions:  If you have concerns about accessing your workplace when elevator services are impacted, please contact your supervisor to find an appropriate accommodation.

Monday, July 29, 2024
Knight Law School #1  Lillis Hall #2 West
Knight Law School #2 Lillis Hall #4 (Room 182)
Knight Law School #3 Lillis Hall #3 East

Tuesday, July 30, 2024
University Health Services – Testing (Passenger)
University Health Services – #1 South
Student Rec Center #1
Student Rec Center #2

Wednesday, July 31, 2024
Living Learning Center North
Living Learning Center South
Price Science Commons
Thompson University Center

Thursday, August 1, 2024
Global Scholars #4 East
Riley Hall
Straub Hall #1 North
Susan Campbell

Friday, August 2, 2024
Lillis Hall #2 West      Knight Law School #1
Lillis Hall #4 (Room 182)  Knight Law School #2
Lillis Hall #3 East        Knight Law School #3

Work Performed By:  CPFM Facilities and Otis Elevator

Contact:  Work Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Overhead image of map highlighting Knight Law School, University Health Services, Student Recreation Center, Living Learning Center North and South, Price Science Commons, Thompson University Center, Global Scholars, Riley Hall, Straub Hall, Susan Campbell, Lillis Hall

7/18/24 – 7/19/24 Collier House Pressure Washing Advisory

Begin:  Thursday, July 18, 2024, at 6:00 am

End:      Friday, July 19, 2024, at 3:00 pm

Building(s) or Area(s) Affected:  Collier House

Scope:  The Collier House deck, railing, and ramp as well as the north entry concrete will be pressure washed.

Services Impacted:  This will affect the west and north entries to the building.  Noise can also be expected during this time.

Work Performed By:  CPFM Facilities Services

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Overhead aerial view of Collier House

7/20/24, 7/21,24, 7/27/24, 7/28/24, 8/05/24 Summer Parking Lot Painting Closures

UPDATE:
Western Asphalt will be back on Monday morning, August 5th, to paint the EV and ADA spaces.  The three lots listed will be shut down Sunday night and closed throughout the day on Monday.  However, once the paint is dry, the signs will be removed and the lots will be reopened.

  • 7B – NW corner of McKenzie Hall (ADA ramp yellow motorcycle)
  • 12B – N of Streisinger, Klamath, and NE of Onyx Bridge
  • 30 – S and E of McArthur Court and W and N of Student Tennis

 

1st Weekend:  Saturday, July 20, 2024 and Sunday, July 21, 2024

2nd Weekend:  Saturday, July 27, 2024, and Sunday, July 28, 2024

Scope: Summer parking lot maintenance will be performed on the weekends for the locations listed below.

Services Impacted: Lots will be closed the preceding Friday night for both Saturday and Sunday work.

Extra Notes: The lots will be re-opened as soon as the paint is dry.

Parking Lots Impacted Saturday, July 20, 2024:
3A – Strip N of Wilkinson House and Millrace Studios and S of ZIRC
3B – Parking areas N of Lock Shop and buildings N of Zebrafish
7A – W of Computing Center
7B – NW corner of McKenzie Hall (ADA ramp yellow motorcycle)
10 – N side of Lawrence Hall
12A – N of Cascade Annex West and East
47 – W and S of Rainier
57 – N of 1600 Millrace and S of the Millrace Garage
60 – SE of 1900 Millrace
Millrace Riverfront
13th Ave Crosswalk

Parking Lots Impacted Sunday, July 21, 2024:
12B – N of Streisinger, Klamath, and NE of Onyx Bridge
23 – E of Johnson Hall and W of Collier House
25 – E of JSMA and W of Susan Campbell
26 – S of Gerlinger Annex
27 – Horseshoe parking E of Hendricks
28 – Horseshoe parking E of Gerlinger Hall
29A – S of EMU
29B – SW corner of the EMU
29D – Street parking W of Straub
30 – S and E of McArthur Court and W and N of Student Tennis
36A – E of Carson and W of University Health Services
36B – SW corner of University Health Services
Carson Loading Dock
Johnson Fire Lane
University Street
15th Ave Crosswalks

Parking Lots Impacted Saturday, July 27, 2024:
33 – N and W of East Campus Graduate Village West
34B – N of Viv Olum Child Center
34C – E of Many Nations Longhouse/Viv Olum/Oregon Law Clinic
37 – Long lot E of Hamilton and W of Ford Alumni Center
39 – S of Agate Hall and Agate House and E of the Agate Apartments
41 – NE parking by Outdoor Program Barn and SW of Jane Sanders Stadium
43 – S of Knight Law Center
44 – Lot between East Campus Graduate Village East and West
46 –  E of Global Scholars Hall and N of NILI
51 – Long lot W of Black Cultural Center and E of NILI
52 – W of UOPD East Station
53 – UOPD lot between UOPD outbuildings and NE of UOPD Station
54 – UOPD lot E of Lot 53
55 – Long narrow parking strip E of Global Scholars Hall and Kalapuya Ilihi

Parking Lots Impacted Sunday, July 28, 2024:
6B – Half-moon N of Miller Theatre and McKenzie Hall, N side of East 11th Ave.
7B – NW corner of McKenzie Hall (ADA Ramp)
16A – NW of PLC and SW of Condon
16B – W of Condon
20 – E of Education Annex and N of Music
42 – W of UO Annex
50 – parking lot for Barnhart Residence Hall
Baker Downtown Center Loading Dock
EC Cares 1500 W. 12th Ave.

Work Performed By: Transportation Services

Contact: James McGladrey, UO Transportation Services Field Operations Manager, 541-346-2676

Overhead map of campus parking lots

Postponed – Knight Library Elevator #8 Shutdown (was 7/15/24 – 7/17/24)

UPDATE:
This work has been postponed and the new date is yet to be determined.  An update will be sent when it has been rescheduled.

 

UPDATE:
Until further notice, ADA access into Knight Library is through the west entrance of the testing center.
The contractor will have signs directing pedestrians to the alternate ADA entrance.  –  See attached map

Map of ADA route during Knight Library elevator #8 work 7/15/24 - 7/17/24

Elevator 8

BeginMonday, July 15, 2024, at 8:00 am   Postponed

End:      Wednesday, July 17, 2024, at 6:00 pm    Postponed

Building(s) or Area(s) Affected:  Knight Library

Scope:  Due to the installation of an access card reader, elevator #8 will be closed Monday, July 15th and Tuesday, July 16th.  Normal operation will resume on Wednesday, July 17th.

Services Impacted:  Elevator #8 will be unavailable during this time.

Special Instructions:  If you have concerns about accessing your workplace when elevator services are impacted, please contact your supervisor to find an appropriate accommodation.

Work Performed By:  REECE Complete Security Systems and Otis Elevator Company

ContactRenee Benoit, CPFM Owner’s Representative, 541-346-5080

Current construction and impacts information can be found on the UO Maps site.

Overhead map image of Knight Library elevator #8

7/06/24 Lot 6A (North of McKenzie) Asphalt Work Advisory

Begin:  Saturday, July 6, 2024

End:     Thursday, July 11, 2024

Parking Lot Impacted:

  • 6A (North of McKenzie and east of Bushnell University’s parking lot)

Scope:  Lot 6A will be closed for asphalt work beginning this Saturday through next Thursday.

Services Impacted:  The lot will be closed the preceding night.

Special Instructions:  Please use an alternate parking lot during this time.

Work Performed By:  Western Asphalt

ContactJames McGladrey, UO Transportation Services Field Operations Manager, 541-346-2676

https://map.uoregon.edu/transportation-uo
https://transportation.uoregon.edu/

Overhead aerial view of Lots 6A and 7B

 

7/08/24 – 7/12/24 Huestis Hall Percent for Art Installation Advisory

Begin:  Monday, July 8, 2024

End:      Friday, July 12, 2024

Building(s) or Area(s) Affected:  Huestis, Willamette, Volcanology, Columbia, EMU, Carson Hall, JMSA (Art deliveries), SRS, FS

Scope:  The Percent for Art installation at Huestis Hall will take place the week of July 8-12.   A crane will be set up on 13th Ave during the installation project. – See attachment images.

Services Impacted:

  • During that time, parking on 13th Ave. at Huestis Hall will be offline and pedestrians are encouraged to use the south sidewalk.
  • Egress/entry to Huestis Hall will be routed east and west to avoid the south plaza area where the installation lifts and crane will be staged.
  • On July 10-11, vehicle through access on 13th Ave. will be limited to one lane of traffic between Carson Hall and Erb Memorial Union.
  • Contractor will provide flaggers.

Special Instructions:  Given the limited access on 13th, deliveries and other through way vehicular activities are requested to limit deliveries or temporarily reroute to 18th Ave and University Street.

Work Performed By:  Metalistics, Ness Campbell

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880

Current construction and impacts information can be found on the UO Maps site.

Overhead map of Huestis Hall Art Installation area affected

Document1