9/02/25 – 11/21/25 CPFM Administration Quonset 2nd Floor Remodeling Advisory
Posted on

UPDATE #2  10/30/25:
Tomorrow, Friday, October 31st, Air Inc. will be balancing the HVAC system for both the 1st and 2nd floors. They will be in each room at least twice and potentially up to four times.
– Also, the completion date has been extended to Friday, November 21st.

UPDATE #1 10/30/25:
The contractor just informed us that he will be cutting some metal tabs in the wall upstairs.  It is expected to be very loud.  Depending on the type of metal they are made of will determine how long the noise will last, potentially up to 30 minutes.

UPDATE 10/24/25:
UO Network Services has installed one of the new wireless access points outside of room 104 but will get the remaining two in next week, between Monday, 10/27/25 and Thursday, 10/30/25.

UPDATE 10/20/25:
UO Network Services will be installing three (3) new wireless hubs on the first floor outside of rooms 104 and 120 as well as in the main lobby near the reception desk.

  • Workers will not be in the area the entire duration.
  • The dates and times given are a window when Network Services could be performing work.
  • There may be some noise and passageways could be blocked.

UPDATE 10/14:
The contractor will begin cutting into the roof for the two new skylights.  Loud noise can be expected for roughly an hour and half.  They are planning to start by 10:30 am.

UPDATE 10/01:
Steam / chilled water lines will be replaced in rooms 210A, 210, and 212.
There should be no impact to the heating / cooling in the rest of the building.
There will be construction noise associated with the pipe replacement and increased foot traffic in the building.
Work will be done by Harvey & Price and Preferred Construction.

UPDATE 9/15:
The contractor just notified us that they will begin staging today near the south side of the building, by the picnic table.  It is also expected that the construction noise levels will begin to elevate in the building, potentially this afternoon.

UPDATE 9/04:
Abatement work will begin on Tuesday, September 9th at 8:30 am and will end on Friday, September 12th at 3:30 pm.
Work will be performed by Asbestos Abatement Contracting, LLC.

UPDATE 8/29:
BELCO Electric will begin removing electrical and conduit this afternoon 8/29/25.  The abatement work has been postponed and will now begin Monday, September 8, 2025 at 8:00 am.

UPDATE 8/26:
Campus Planning is relocating to Rainier during the renovation of their space on the 2nd floor of Building #136. Moving will occur Thursday, August 28th from 8:00 am to 12:00 noon.  Please expect increased activity at both sets of stairs in the Quonset.

 

Begin:  Tuesday, September 2, 2025, at 7:00 am

End:      October 31   Friday, November 21, 2025, at 5:00 pm

Building(s) or Area(s) Affected:  CPFM Administration Quonset

Scope:  Campus Planning’s space on the 2nd floor of Building #136 is being remodeled. We are building two offices on the east side of room 212. Two new skylights will be installed in the new offices.

Services Impacted:  Construction noise is to be anticipated throughout the building for the duration of the project.

Work Performed By:  Preferred Construction

ContactRenee Benoit, CPFM Owner’s Representative, 541-346-5080

Current construction and impacts information can be found on the UO Maps site.

Overhead map view of CPFM Administration Quonset room 212

8/01/25 UO Portland Campus Center, Centennial Hall, IT Building, and 30th Ave Apartments North and South Electrical Shutdown and Campus E-phones Offline
Posted on

Begin:  Friday, August 1, 2025, at 7:00 am

End:      Friday, August 1, 2025, at approximately 2:00 pm

Building(s) or Area(s) Affected:  UO Portland Campus Center (852), Centennial Hall (853), IT Building (850), 30th Avenue Apartments North (864) and South (865)

Scope:  The electrical switchgear will be shut down for correction work by the electrical subcontractor. This work is remaining from the punch list items pending completion.

Services Impacted: See details listed below –

Campus Center (852) – no power to the building, no network services, no security, no mechanical, no elevator

  • Loss of power to the building with no mechanical service
  • Loss of network connectivity for client computers/devices (both on wired and wireless network)
  • Security cameras will shut off
  • Access Control will be unreachable through Symmetry and card swipes may not register
  • Lenel Server will be shut down
  • AV equipment may become unreachable
  • Voice Gateway, for emergency phones (campus wide) and elevator phones, will have no network connectivity for the gateway. Elevator and emergency phones will be out of order. ‘Out of Order’ signs will be posted on all emergency phones and elevator doors

Centennial Hall (853) – no power to the building

  • Loss of power to the building

IT Shelter (850) – no security, no BAS controls

  • Loss of network connectivity to Access Control, security camera, and HVAC controls
  • Campus router and Out of Band management are DC plant powered, backed by ATS/MTS/generator so they should remain up

30th Apartments (864) & (865) – no network services

  • Loss of network connectivity for client computers/devices (both on wired and wireless) as network connectivity for this building is now passively connected through Elizabeth basement to network equipment in Campus Center

Campus Wide

  • Emergency phones across campus – no network services (phones out of service)

Special Instructions:  If you have concerns about accessing your workplace when elevator services are impacted, please contact your supervisor to find an appropriate accommodation.

Special Instructions:  Please shut down and unplug all multi-function copier devices as well as any printers during scheduled power outages. The software on these machines can be negatively affected due to the power surge when the power is turned back on.  A power surge can corrupt the clone files in the machines and change preconfigured settings.  For questions, please contact Kati Kronholm at 541-346-5370 or katik@uoregon.edu.  For non-copier questions, please reach out to the contact person listed below.

Work Performed By:  EC Electric under Howard S Wright

Contact:  Melissa Moshofsky, CPFM Owner’s Representative, 541-346-3712

Current construction and impacts information can be found on the UO Maps site.

Overhead map view of Portland Campus buildings affected by power outage 8/01/25

6/18/25 Campus Server Maintenance on Call Log and ANVIL Advisory
Posted on

Begin:  Wednesday, June 18, 2025, at 9:00 am

End:      Wednesday, June 18, 2025, at 11:00 am

Scope:  The Call Log and ANVIL applications will be undergoing some important upgrades.  We’ve planned a brief window within which to ‘flip some important switches.’  Typically, the work is completed in under 30 minutes.

Special Instructions:  Please block this time out and be prepared to not log any new calls or use ANVIL until you receive an “all clear” update.

Work Performed By:  UO Location Innovation Lab

Contact:  Work Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Overhead map view of Campus

8/07/24, 8/21/24, and 8/29/24 Huestis Hall and Lokey Labs Electrical Shutdowns
Posted on

Dates Involved:         Wednesday, August 7, 2024, from 5:00 am to 7:00 am
Wednesday, August 21, 2024, from 6:00 am to 8:00 am
Thursday, August 29, 2024, from 6:00 am to 8:00 am

Building(s) or Area(s) Affected:  Huestis Hall, Lokey Labs

Scope:  To complete electrical coordination work between Huestis and Lokey Labs, three (3) separate electrical shutdowns are required as follows:

August 7, 2024, from 5:00 am – 7:00 am
– Lokey Labs: Brief 15-minute normal power shut down to Lokey Labs panel 2N5
– Huestis basement: 2-hour lighting outage in Huestis zebrafish facility 16A and 16B.

August 21, 2024, from 6:00 am – 8:00 am Standby Power
– Lokey Labs: Standby panel 2S2 will be offline. Kurt Langworthy to shut down servers prior to the event.
– Lokey Labs and Huestis Hall: Network will be down
– Huestis Hall: Siemens BAS will be affected by network disruptions, alarms are anticipated
– Huestis Basement: Standby power to Suite 34 will be offline.

August 29, 2024, from 6:00 am – 8:00 am
– Lokey Labs: Brief 15-minute standby and normal power shutdown to Lokey Labs panel 2N5.
– Lokey Labs: Siemens BAS will be affected, alarms are anticipated.

Special Instructions:  Please shut down and unplug all multi-function copier devices as well as any printers during scheduled power outages. The software on these machines can be negatively affected due to the power surge when the power is turned back on.  A power surge can corrupt the clone files in the machines and change preconfigured settings.  For questions, please contact Kati Kronholm at 541-346-5370 or katik@uoregon.edu.  For non-copier questions, please reach out to the contact person listed below.

Additional Instructions:  If you have concerns about accessing your workplace when elevator services are impacted, please contact your supervisor to find an appropriate accommodation.

Work Performed By:  EC Electric

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880

Current construction and impacts information can be found on the UO Maps site.

Overhead map view of Huestis and Lokey Labs

Fenton Hall Stacks Network Cable Relocation and Wi-Fi Access Advisory 7/10/23
Posted on

Begin:  Monday, July 10, 2023, at 7:00 am

End:      Monday, July 10, 2023, at 4:00 pm

Building(s) or Area(s) Affected:  Fenton Hall

Scope:  Due to alterations to the upper level of the Fenton Stacks (room 314), the network cables will need to be relocated.  This will involve some down-time for UO network cables and Wi-Fi access in Fenton 314, 214, and 114.

Services Impacted:  This outage should not affect the main Fenton building users, but will affect the library stacks.

Work Performed By:  GBC Construction

ContactTim Allenbaugh, CPFM Owner’s Representative, 541-346-8214

Current construction and impacts information can be found on the UO Maps site.

Image of Fenton 314

1/31/23 Huestis Hall Suite 34 Exhaust and HVAC Air Supply Shutdown
Posted on

Begin:  Tuesday, January 31, 2023, at 9:00 am

End:      Tuesday, January 31, 2023, at 12:00 noon

Building(s) or Area(s) Affected:  Huestis Hall Basement Suite 34

Scope:  As part of the Huestis Renovation project, Siemens will temporarily shut down network connectivity to BAS devices in the Zebrafish Quarantine facility via PXCM71 and associated DXRs.

Services Impacted:  This will affect supply and exhaust air to Suite 34.

Work Performed By:  Siemens

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880

Current construction and impacts information can be found on the UO Maps site.

1715 Franklin Electrical Shutdown 6/18/20
Posted on

UPDATE:

Please note that both the data network and telephone services to the building may be out for the duration of the power outage.

 

Begin:  Thursday, June 18th, 2020 at 6:30 pm

End:      Friday, June 19th, 2020 at 12:01 am

Building(s) or Area(s) Impacted:  1715 Franklin Blvd

Scope:  EWEB will be shutting down power for approximately five and one-half hours.

Services Impacted:

  • Electricity will be off for the entire building.
  • Both the data network and telephone services to the building may be out for the duration of the power outage.

Special Instructions:  Please shut down all multi-function copier devices as well as any printers during scheduled power outages. The software on these machines can be negatively affected due to the power surge when power is turned back on, a power surge can corrupt the clone files in the machines, and can change preconfigured settings.

Work Performed By:  EWEB

ContactMelinda Seeley, CPFM Campus Planning Real Estate Prop Specialist, 541-346-5550

Lillis Hall Electrical Shutdown 8/20/19
Posted on

CPFM Utilities and Energy have scheduled an electrical shutdown on August 20th from 4:00 am – 6:30 am at Lillis Hall to add new hardware for electrical metering.  This is part of the campus energy management campaign to capture energy use on campus.  Advance notice was sent to Facilities Liaisons on July 25th.

This will impact:

BEW4, BNW2, PSW2, 2SW2, 3SW2, BSE2, 3SE2, SWB ,PSE2, BSW2

Impact to phones, network, and card reader access:

  • Phone:   Analog phones run off the phone cabinet on DC power in the 2nd floor closet, so they should stay up.  (analog sets would include elevator phones, emergency phones, analog courtesy phones, black desk phones, fax, etc.) IP sets on folks’ desks may or may not stay up / working depending on network
  • Network:   The gateway is in the D closet 3rd floor, it’s on a UPS, and may ride out any outage.  Edge switches will be a mix, some are on electrical circuits that are not affected so will stay up, some will go down.
    Private network gateway appears to be on an affected circuit and as such will go down for the duration of the outage.
  • Building Access: There will be a controlled power shut down/power up of this system.  The main south entrance will be manned to allow access as none of the card readers in the building will be operational during this time.

Other impacted areas/equipment:

  • AHU6 Supply/Return
  • Mechanical room outlets
  • Reception outlets
  • Lighting utility
  • Room 51
  • Tunnel lighting
  • Heat meters
  • Elevator 2 lights
  • Elevator mechanical room outlet/lights
  • Elevator pit lights
  • EF-8 Fan
  • East/West Atrium outlets
  • CP-35
  • CP-31
  • CP-21
  • WH-1
  • WH-CP
  • Tunnel sump pump

For questions and concerns, please contact CPFM UE Electrical Superintendent Rick Tabor at 541-346-7511 or rtabor@uoregon.edu.

5/19/18: Oregon Hall Electrical and Network Shutdown
Posted on

Building Occupants,

As part of the Oregon Hall Renovations on Saturday, May 19, 2018, from 6:00 am – 3:30 pm contractors will be shutting down the 800A breaker in the Basement MDA Panel Labeled West Power/Lights.  This will impact lights, receptacles, and mechanical equipment that services the west portion of the building and network equipment in Room 225.  The Building Network system will be down, except for areas served by East Wing data rooms.  West side lighting, receptacles, mechanical equipment and the network will all be shut down during this time.

This work is necessary to allow for re-circuiting lights, receptacles and power to network equipment.

For questions or concerns please contact CPFM Design and Construction Owners Rep Patrick Mucker at 541-346-8216.