6/23/25 – 10/31/25 Portland Holman Apartment Buildings North and South Exterior Work Advisory

UPDATE 10/16/25:
The end date for the north building has been extended to Friday, October 31st, and post construction will include landscape repair.

  • Construction fencing and scaffolding have been removed.
  • Quiet construction work is to be expected for the duration of the effort with work in apartment interiors.
  • Landscape repair will start on October 20th and continue to completion up to October 31st.  Garden beds surrounding both north and south buildings will get refreshed.
  • Additional tree stump grinding has been scheduled for Monday, October 20th.

 

UPDATE 9/11/25:
The end dates have been adjusted based on the location.  Closure dates and details have been updated and added below in bolded letters.  Also, the revised logistics map has been replaced below.

 

Begin:  Monday, June 23, 2025, at 8:00 am

End:      South building – Thursday, September 19, 2025
…………..North building – October 21   Friday, October 31, 2025
…………..Landscape Repair – Friday, October 31, 2025

Building(s) or Area(s) Affected:  Holman Apartment Buildings North and South

Scope:  The Holman Apartments will undergo EIFS a full siding removal and siding replacement, as well window removal and replacement.  PDX NE Campus – entirety of the Holman Apartment buildings North and South, located at NE Holman Street and NE 29th Ave, are unoccupied for construction commence until construction complete.

Services Impacted:

  • E/W pedestrian access through the Holman Apartment courtyard will be closed until 9/16, as well a portion of the N/S pedestrian access between Holman Apts. and East Hall.
  • N/S pedestrian access shall remain.
  • Pedestrian access at the sidewalk to the North of the North Holman Apt building shall remain will be closed for continuation of work on the North building.
  • Accessible entry to East Hall – please use building entrance at NE 30th Ave up through 9/16. Main entry to East Hall – shall remain open.
  • There will be construction related noise for the duration of the effort.
  • Tree trimming/removal/chipping by Owner on 6/26 and stump grinding the week of 9/15 will also be noisy.

Work Performed By:  Truebeck Construction

ContactMelissa Moshofsky, CPFM Owner’s Representative, 541-346-3712

Current construction and impacts information can be found on the UO Maps site.

Holman Apartment Buildings Revised Logistics 9-11-25