7/6/22 Onyx Bridge HVAC Construction Activity Advisory

Begin:  Wednesday, July 6th, 2022 at 7:00 am

End:      Wednesday, July 6th, 2022 at 9:00 am

Building(s) or Area(s) Affected:  Onyx Bridge

Scope:  As part of an HVAC installation within room 291, be advised that contactors will be drilling through the adjacent hallway wall, for approximately two hours, in order to prep for incoming refrigerant lines.

Services Impacted:

  • The areas that will be affected by the construction noise and activity are room 291 and the adjacent hallway, as shown in the picture below.
  • This is not expected to cause disturbances to adjacent spaces beyond some moderate construction noise during the course of the work.

Work Performed By:  Phoenix Mechanical

ContactDamon Rutherford, CPFM D&C Owner’s Representative, 541-346-8285

To view current construction and impacts. visit UO Map.

7/5/22 -7/6/22 Millrace Studio 3 and ZIRC Road and Lot 3A Closure

Begin:  Tuesday, July 5th, 2022 at 5:00 am

End:      Wednesday, July 6th, 2022 at 5:00 pm

Building(s) or Area(s) Impacted:  Road between ZIRC and Millrace Studio 3. From 3A lot spaces 1-15

Scope:  The road will be closed between ZIRC and the Millrace Studios to support a construction project.

Services Impacted:  Access will be blocked off during this time, but this may take less time than expected

Special Instructions:  A detour is available on the north side of the CPFM Administration Quonset or access can be obtained from the east via Riverfront Parkway.

Work Performed By:  Fortis Construction

ContactColin Brennan, CPFM Owner’s Representative, 541-346-8242 or 541-654-2972

7/1/22 – 7/31/22 Campus Air Handling Unit Preventative Maintenance Schedule for July 2022

Begin:  July 1st, 2022

End:     July 31th, 2022

Building(s) or Area(s) Impacted:

  • Thompson University Center
  • Prince Lucien Campbell Hall
  • EC Cares Modular Classroom
  • EC Cares Modular Westmoreland
  • EC Cares Main Office
  • Condon Hall

Scope:  Preventative Maintenance work will be performed, over the course of the month, for the buildings listed above.

Services Impacted:  No services are expected to be impacted.

Work Performed By:  CPFM Preventative Maintenance Crew or Contractor

ContactKyle Harshbarger, CPFM Mechanical and Plumbing Shop Manager, 541-346-5406

7/1/22 – 8/12/22 Computing Center Emergency Air Conditioning Shutdown

UPDATE 8/12: The air conditioning is back online.

UPDATE 8/2: Computing Center second floor A/C is still offline. CPFM Mechanical Shop is picking up the replacement part today and plan to start repairs this week. They expect the issue to be resolved by the 12th.

UPDATE 7/13: The second floor HVAC is still offline. The occupants will experience warmer room temperatures. The CPFM Mechanical Shop is in the process of planning the repair.

Begin:  Friday, July 1st, 2022

EndUnknown August 12, 2022

Building Impacted:  Computing Center

Scope: Emergency air conditioning shutdown due to a damaged chilled water coil in the second floor air handler. It was necessary to isolate the coil to prevent water from leaking onto the first floor electrical equipment.

Services Impacted: The second floor rooms will not have air conditioning until the leak is repaired. The air conditioning to the server rooms is not impacted by this outage.

Work Performed By:  CPFM Mechanical Shop

ContactKyle Harshbarger, CPFM Mechanical and Plumbing Shop Manager, 541-346-2055

To view current construction and impacts, visit UO Map.

7/1/22 – 7/2/22 Knight Law informational advisory (windows washing)

Begin:  Friday, July 1, 2022 at 8:00 am

End:  Saturday, July 2, 2022 at 5:00 pm

Building Affected: Knight Law School

Scope: All exterior windows are being washed.

Services Impacted:  Expect temporary sidewalk and building access issues as they move around the exterior of the building.

Work Performed By:  American Cleaning Solutions

ContactKevin Farthing, CPFM Assoc. Dir Facilities Services Env., 541-359-6633

To view current construction and impacts, visit UO Map.