5/4/22 Streisinger Elevator Unresponsive

Begin:  May 4, 2022

End:      Unknown

Building(s) or Area(s) Impacted:  Streisinger Hall

Scope:  The elevator is unresponsive. Otis has been called for repairs.

Services Impacted: Elevator access in the building.

Special Instructions: Please use the Huestis elevator until repairs are complete. An update will be sent when the elevator is back in operation.

Work Performed By:  Otis

Contact: Work Control Center, Campus Planning and Facilities Management, 346-2319

5/4/22 Willamette Hall, Lokey Labs, LISB Process Cooling Water System Testing Advisory

Begin:  Wednesday, May 4th, 2022 at 8:00 am

End:      Wednesday, May 4th, 2022 at 10:00 am

Building(s) or Area(s) Impacted:  Willamette, Lokey Labs, Laser Cooling, LISB (partial but not the MRI Cooling Water).

Scope:  We will be testing the industrial city water back up to the process cooling water system in Willamette Hall.  Building users of the process cooling may see a slight impact to process cooling water during the test.  Please notify CPFM Work Control of any major process cooling water temperature issues during the test.

Services Impacted:  This will affect the process cooling heat exchangers

Extra Notes:  This test will not impact MRI Cooling water in LISB.

Work Performed By:  CPFM FS Building Automation Systems Crew

ContactKyle Wilson, CPFM Utilities Maintenance Manager, 541-346-2246 or Stacy Breaux, CPFM FS Building Automation Systems Field Supervisor, 541-346-2304

5/3/22 – 5/7/22 Lillis Business Complex Trash & Cardboard Temporarily Relocated 5/3/22 – 5/7/22

Begin:  Tuesday, May 3rd, 2022

End:      Saturday, May 7th, 2022

Building(s) or Area(s) Impacted:  Lillis Business Complex

Scope:  The trash and cardboard dumpsters at Lillis have been temporarily relocated to the corner of 13th Avenue and Kincaid Street for the rest of the week due to the street faire.

Services Impacted:  Dumpsters temporarily relocated.

Work Performed By:  FS Refuse/Zero Waste

ContactDonny Addison, CPFM Zero Waste Solid Waste Manager, 541-346-0961

5/3/22 Klamath Process Chilled Water (PCW) Shutdown

Begin: Tuesday, May 3rd, 2022 at 6:00 am

End: Tuesday, May 3rd, 2022 at 4:00 pm

Building(s) or Area(s) Impacted: Klamath (Outage only), Willamette, ONAMI (ISC), LISB (Informational notice)

Scope: As a part of the Huestis Renovation project, a walk-in cooler is being installed in the Prep room (KLA 19), which will require the addition of a new process chilled water (PCW) connection to the existing system. Klamath users will have no PCW during the proposed work. All other buildings utilizing PCW will remain operational during the work

Services Impacted: All Process Chilled Water, (Klamath building wide only)

Special Instructions: . Once work is complete (Tuesday afternoon), building users may notice a slight disruption in services as the Klamath system comes back on line.

Work Performed By: Mortenson Construction

Contact: Tim Allenbaugh, CPFM Owner’s Representative, 541-346-8214

8/09/22 Baker Downtown Center Chilled Water Shutdown Notice

Begin:  Tuesday, August 9th, 2022 at 7:00 am

End:      Tuesday, August 9th, 2022 at 4:00 pm

Building(s) or Area(s) Affected:  Baker Downtown Center, Rooms 100 – 140

Scope:  The chilled water system that serves the air handling units for the south side of the building will be shut down

Services Impacted:   The affected areas will not have air conditioning during this time

Work Performed By:  FM Sheet Metal

Contact: Kyle Harshbarger, CPFM Mechanical and Plumbing Shop Manager, 541-346-5406