Gerlinger Hall and Gerlinger Annex Exterior Window Washing 2/20/2020 – 2/24/2020

Gerlinger Hall
Begin:  Thursday, February 20th, 2020
End:     Saturday, February 22nd, 2020

Gerlinger Annex
Begin:  Sunday, February 23rd, 2020
End:     Monday, February 24th, 2020

Building Impacted:  Gerlinger Hall and Gerlinger Annex

Scope:  The exterior windows will be washed.

Services Impacted:  Due to the use of the lift, the walkways will be partially blocked, but will not interfere with ADA entrances.

Extra Notes:  Work will be performed by DDJ.

Special Instructions:   Please close all exterior windows on these dates.

Contact:  Kevin Farthing at 541-359-6633 or kfarthin@uoregon.edu

Huestis Hall Exterior Washing 12/28/19 – 12/30/19

Begin:  Saturday, December 28th, 2019 at 8:00 am

End:      Monday, December 30th, 2019 at 10:00 am

Building or Area Impacted:  Huestis Hall Building Exterior

Scope:   Complete washing of building exterior

Services Impacted:  Please be aware of the lift staging area.  Walkways may be partially blocked, but will not interfere with ADA entrances.

ContactKevin Farthing, Assoc. Director Facilities Services Environmental Services at 541-346-2857

Campus Roof Cleaning Schedule Advisory 12/23/19 – 2/28/20

Update 2/20/2020: The roof cleaning has been extended for the Alder Building, Straub, and the Indoor Tennis Courts. The work will be completed on Friday, February 28th.

Update 2/6/2020: Due to leaks that have appeared from the recent rains, this work has been delayed and is now expected to be completed on Friday, February 21st.

Update 1/21/2020: The roof cleaning has been extended for Villard, Computing Center, UO Annex, Hendricks, Gerlinger, Gerlinger Annex, Susan Campbell, Knight Library, Lokey ED, Clinical Services, Indoor Tennis Courts, and the Museum of Natural and Cultural History. The roof cleaning is expected to be completed on Thursday, February 6th.

Begin:  December 23, 2019

End:  January 23 February 21 28, 2020

 Scope: Roof cleaning will be conducted across campus with the assistance of a lift.   Please be aware of the lift staging area, which will move from building to building.  Blowers may be utilized, but will not push the debris from the roofs.  Some noise can be expected with this activity.

Special Instructions:  Work will be performed during this window of time and specific dates are not being assigned to each building, but will be done in the order listed.

ContactWork Control Center

Campus Roof Cleaning Schedule in Sequential Order:

Building
Willamette
Cascade
Cascade Annex East
Pacific
Lawrence
Allen Hall
Friendly
Fenton
Villard
Miller Theater
McKenzie
Computing Center
UO Annex
Chiles
Peterson
Lillis
Condon
Chapman
Johnson
Collier
Hendricks
Gerlinger
Gerlinger Annex
Susan Campbell
Knight Library
Alder
Lokey Ed (Bldg 007)
Lokey Ed (Bldg 041)
Clinical Services
Indoor Tennis Courts
Esslinger
SRC
Straub
Agate
Vivian Olum
MNCH

Fenton Hall Exterior Window Washing 10/10/19 – 10/11/19

On Thursday, October 10th through Friday, October 11th, the exterior windows will be washed at Fenton Hall.  Due to the use of the lift, the walkways will be partially blocked, but will not interfere with ADA entrances.

Please close all exterior windows on these dates.

For questions or concerns, please contact Kevin Farthing at 346-2857 or kfarthin@uoregon.edu.

Friendly Hall Tree Trimming South Side of Building. Sidewalk Closed 3/17/17

On Friday, March 17th the sidewalk on the south side of Friendly Hall will be closed due to a lift being utilized for tree trimming and gutter work from 7:30am to 2:00pm. Please use an alternate route due to safety concerns.

For questions or concerns about how this may impact paths of travel, contact Jim Cody Zone A Maintenance Manager at 541-346-2302.

Mar 27-31, 2017: Huestis Hall 3rd Floor Window Replacement

Building Occupants,

During Spring Break March 27 – 31, 2017, windows are scheduled to be replaced in Huestis 306 as part of Lab Renovations.

Schedule:

  • March 27 from 7:30 am – 12:00 pm (noon) Contractors will utilize a lift at the south end of the building to lift the new windows to the 3rd Floor. There will be portions of the sidewalk along East 13th St that will be closed during this activity.
  • March 27 – 31, 2017 Windows will be replaced in Lab 306 from the inside. Sidewalks to the east of the building will be restricted (see diagram).

For questions or concerns about how this may impact your area, contact Patrick Mucker, CPFM Design and Construction at 346-8216.