Mar 27-31, 2017: Huestis Hall 3rd Floor Window Replacement

Building Occupants,

During Spring Break March 27 – 31, 2017, windows are scheduled to be replaced in Huestis 306 as part of Lab Renovations.

Schedule:

  • March 27 from 7:30 am – 12:00 pm (noon) Contractors will utilize a lift at the south end of the building to lift the new windows to the 3rd Floor. There will be portions of the sidewalk along East 13th St that will be closed during this activity.
  • March 27 – 31, 2017 Windows will be replaced in Lab 306 from the inside. Sidewalks to the east of the building will be restricted (see diagram).

For questions or concerns about how this may impact your area, contact Patrick Mucker, CPFM Design and Construction at 346-8216.