8/22/25 South Side of Straub Hall and Earl Hall Boom Lift Activity and Egress Advisory

Begin:  Friday, August 22, 2025, at 8:00 am

End:      Friday, August 22, 2025, at 3:30 pm

Building(s) or Area(s) Affected:  Walkway between Straub and Young Hall on the South end of Straub.

Scope:  We will be pulling our boom lift into the egress walkway on the south end of Straub Hall to reach gutter downspouts inside the south courtyard.  We will be working above the S196 stairwell exit on the downspout collection boxes.

Services Impacted:  There will be no egress in or out of the south Straub courtyard on this walkway.

Work Performed By:  CPFM Maintenance Support

ContactGabe Hein, CPFM Maintenance Support Supervisor, 541-346-7563

Work Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Overhead aerial view of section of sidewalk closed between Straub Hall and Earl Hall (Young Hall) plus map showing location of Stairwell 196