12/15/25 – 3/25/26 LISB Room 012B Lab Remodel Advisory
Posted on

Begin:  Monday, December 15, 2025 at 7:00 am

End:      Wednesday, March 25, 2026 at 4:00 pm

Building(s) or Area(s) Affected:  Lewis Integrated Science Building Room 012B

Scope:  The Lab space will be remodeled, to include the installation of a glove box, a sputtering machine, and gas piping, as well as electrical and HVAC modifications.  Construction mobilization begins in December, demolition in early January, with major construction activities in February and March.

Services Impacted:  Construction noise and activity can be expected with occasional planned mechanical, electrical, and plumbing system shutdowns in and around room 012B.

Work Performed By:  Andersen Construction

ContactDavid Mason, CPFM Owner’s Representative, 541-346-5679

Current construction and impacts information can be found on the UO Maps site.

lewis integrated science building on the map

10/28/25 – 1/30/26 Lewis Integrative Science Building Lab Remodeling Advisory
Posted on

Begin:  Tuesday, October 28, 2025, at 7:00 am

End:      Friday, January 30, 2026, at 4:00 pm

Building(s) or Area(s) Affected:  Lewis Integrative Science Building – rooms 009 and 012B

Scope:  Labs 009 and 012B will be remodeled:

  • October – November – A new Glove Box will be installed in Lab Room 009.
  • November – January – A new Glove Box and other equipment will be installed in Lab Room 012B.

Services Impacted:

  • October – November – Minimal to no impact to the building or users is expected.
  • November – January – Work is expected to be more disruptive, additional notices will be sent out as construction activities commence.

Work Performed By:  Luna Design and Construction

ContactDavid Mason, CPFM Owner’s Representative, 541-346-5679

Current construction and impacts information can be found on the UO Maps site.

LISB on the map

10/13/25 – 1/09/26 Clinical Services Building Rooms 100 – 127 Remodeling Advisory
Posted on

Begin:  Monday, October 13, 2025, at 7:00 am

End:      Friday, January 9, 2026, at 4:00 pm

Building(s) or Area(s) Affected:  Clinical Services Building – Rooms 100 – 127

Scope:  The rooms listed above will be remodeled. This includes new insulation, sheetrock, painting, new flooring, new lighting, minor HVAC and plumbing modifications.

Services Impacted:

  • Occasional noise and odors typical to construction can be expected.
  • At some point, still TBD, there will need to be a water shutdown and possibly HVAC airflow.

Work Performed By:  Store and Stock LLC

ContactGlen Macdonald, CPFM Owner’s Representative, 541-346-8201

Current construction and impacts information can be found on the UO Maps site.

Overhead map view of Clinical Services rooms 100 - 127

9/08/25 – 1/05/26 Portland Gymnasium Improvement Project
Posted on

Begin:  Monday, September 8, 2025, at 7:00 am

End:      Monday, January 5, 2026, at 2:00 pm

Building(s) or Area(s) Affected:  Portland Gymnasium

Scope:  The Gymnasium Improvement Project includes:

  • Basement level – upgrading vertical access from grade to basement, updating basement restrooms for all user access, adding changing rooms, shower rooms, lockers, new drinking fountain with bottle fill, updating/refreshing the weight room.
  • First floor – new drinking fountain with bottle fill, updating/refreshing the main lobby.
  • General building – new hot water heater.

Services Impacted:

  • Facilities staff located in the basement will not be able to use the stairs or areas where cordoned off for scheduled construction.
  • Users of the first-floor gym will still have access.
  • There will be no hot water in the building due to the scheduled plumbing work.
  • A portion of the east/west sidewalk at south side of building and a portion of the parking spaces at south side of building will be affected.

Work Performed By:  Howard S Wright

ContactMelissa Moshofsky, CPFM Owner’s Representative, 541-346-3712

Current construction and impacts information can be found on the UO Maps site.Drawing plans for the Portland Gymnasium Improvement Project for 9-8-25 thru 1-5-26

GymnasiumS_mm20250829
GymnasiumB_mm20250827
Gymnasium1_mm20250827

6/16/25 – 8/15/25 Agate Hall Rooms 126 – 134 Remodeling Advisory
Posted on

Begin:  Monday, June 16, 2025, at 7:00 am

End:      Friday, August 15, 2025, at 5:00 pm

Building(s) or Area(s) Affected:  Agate Hall Rooms 126 – 134

Scope:  A remodel for the Museum of Natural and Cultural History is occurring in Agate Hall. This includes the installation of walls and doors, HVAC equipment, as well as plumbing and cabinets in Room 126.

Services Impacted:  Anticipate noise for the duration of the project. Standard construction equipment will be used periodically throughout the day.

Work Performed By:  Preferred Construction

ContactRenee Benoit, CPFM Owner’s Representative, 541-346-5080

Current construction and impacts information can be found on the UO Maps site.

Overhead map view of Agate Hall rooms 126 - 134

5/15/25 – 7/21/25 Knight Law Room 182 Demolition and Remodeling Advisory
Posted on

Begin:  Thursday, May 15, 2025, at 7:00 am

End:      Monday, July 21, 2025, at 4:00 pm

Building(s) or Area(s) Affected:  Knight Law Center – room 182

Scope:  Demolition and remodeling work will take place in this space.

Services Impacted:  Occasional noise and odor can be expected during this time.

Work Performed By:  CPFM Crews

ContactDavid Mason, CPFM Owner’s Representative, 541-346-5679

Current construction and impacts information can be found on the UO Maps site.

Overhead map view of Knight Law Center room 182

4/18/25 – 5/31/25 Streisinger Hall Room 276B Wall Removal Advisory
Posted on

UPDATE:  This work has been postponed until further notice.

Begin:  Friday, April 18, 2025

End:      Saturday, May 31, 2025

Building(s) or Area(s) Affected:  Streisinger Hall

Scope:  The north wall of room 276B is being removed.

Services Impacted:

  • Plumbing piping needs to be re-routed from Room 190-276B.
  • Waste piping from Room 375C will be temporarily shut down in May.
  • Loud concrete drilling will happen during plumbing work.
  • Normal construction noise is to be expected.
  • New paint and flooring installation may have minimum smell.

Work Performed By:  CPFM Crews and Brothers Plumbing

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Overhead map view of Streisinger Hall room 276B

4/14/25 – 4/25/25, 5/09/25 Ford Alumni Center Room 208 Construction Activity and Loud Noise Advisory
Posted on

UPDATE:
Additional concrete drilling will take place to install new sound panels Friday, May 9th, from 7:00 am to 4:00 pm.  Noise, vibration, and dust can be expected during this time.

 

Begin:  Monday, April 14, 2025

End:      Friday, April 25, 2025

Additional Date:  Friday, May 9, 2025, from 7:00 am to 4:00 pm

Building(s) or Area(s) Affected:  Ford Alumni Center

Scope:  Room 208 is being remodeled into a video studio, involving concrete drilling and painting.

Services Impacted:  Loud noise and odors are to be expected during this time.

Work Performed By:  CPFM Crews and EC Power

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Overhead map view of room 208 in Ford Alumni Center

12/19/24 Johnson Hall Fire Sprinkler System Shutdown
Posted on

Begin:  Thursday, December 19, 2024, at 7:00 am

End:      Thursday, December 19, 2024, at 2:00 pm

Building(s) or Area(s) Affected:  Johnson Hall

Scope:  Due to the installation of a fire sprinkler head in the Office of General Counsel remodel, the fire sprinkler system will be shut down to complete the work.

Details:  Horns, Strobes, and Speakers on the fire alarm system will not sound after the scheduled time. Provisions have been taken to monitor the building fire systems during this time and alarms that occur after the scheduled time should be considered real events and occupants should evacuate as usual per the U of O Emergency Procedures.

Special Instructions:  If there are questions regarding emergency evacuation, please visit Emergency Management & Continuity, https://safety.uoregon.edu/evacuations.

Work Performed By:  Swinerton Builders, Swift, and IES

ContactRenee Benoit, CPFM Owner’s Representative, 541-346-5080

Current construction and impacts information can be found on the UO Maps site.

Overhead map view of Johnson Hall room 219

10/21/24 – 3/31/25 Johnson Hall 219-221 Remodeling Advisory
Posted on

UPDATE 11/19/24:
The work on the fire sprinkler heads has been rescheduled for Monday, November 25th.

 

UPDATE 11/14/24:
Scope: The fire alarm system will be temporarily shut down on Tuesday, November 19 starting at 7:00 am for Swinerton to relocate some fire sprinkler heads in rooms 219-221. The work is expected to take a few hours, and the system will be reactivated once work is complete.

Details:  Horns, Strobes, and Speakers on the fire alarm system will not sound after the scheduled time. Provisions have been taken to monitor the building fire systems during this time and alarms that occur after the scheduled time should be considered real events and occupants should evacuate as usual per the U of O Emergency Procedures.

Special Instructions:  If there are questions regarding emergency evacuation, please visit Emergency Management & Continuity, https://safety.uoregon.edu/evacuations.

 

UPDATE 11/01/24:
Demolition of clay tile will be occurring November 5th – 8th, from 5:00 am to 9:00 am.  There will be considerable noise during these hours.

 

UPDATE 10/24/24:
A temporary wall is being constructed on the south side of room #206 on Monday, October 28th, between 8:00 am and 5:00 pm.  It will remain in place for the duration of the project.

 

UPDATE 9/26/24:
The construction start date has been adjusted to Monday, October 21.  The completion date is still planned for March 31, 2025.

 

BeginTuesday, October 1    Monday, October 21, 2024, at 7:00 am

End:      Monday, March 31, 2025, at 5:00 pm

Building(s) or Area(s) Affected:  Johnson Hall

Scope:  The Office of General Counsel is planning a remodel of their spaces in Johnson Hall – Rooms 219-221. The construction is expected to take approximately six (6) months starting around the 1st of October.

Services Impacted:  During this time, there will be various disruptions due to the construction, including impacts to rooms 202, 207, and 217.

Special Instructions:  If you would like to receive direct weekly updates, please email me and I will put you on an email update list for the project.

Work Performed By:  Swinerton Builders

ContactRenee Benoit, CPFM Owner’s Representative, 541-346-5080

Current construction and impacts information can be found on the UO Maps site.

Overhead map view of the 2nd floor of Johnson Hall

9/03/24 – 9/20/24 Lewis Integrative Science Building 12A and 33 Remodel Advisory
Posted on

Begin:  Tuesday, September 3, 2024, at 7:00 am

End:      Friday, September 20, 2024, at 4:00 pm

Building(s) or Area(s) Affected:  Lewis Integrative Science Building 012A and 033

Scope:  Due to a lab remodel in room 012A, mechanical and electrical contractors will be performing updates in 012A and 033.

Services Impacted:  This will affect systems in rooms 012A and 033 only.

Work Performed By:  Harvey and Price and OEG

ContactDavid Mason, CPFM Owner’s Representative, 541-346-5679