4/12/17: Planned HVAC Shutdown for preventative maintenance work (ZIRC/ZIRC Annex)

Building Occupants,

Due to scheduled preventative maintenance on ZIRC 101 and ZIRC Annex, occupants should expect intermittent shutdowns (heating and cooling) on air handling units and restroom exhaust fans to allow crews to change system filters.  Scheduled work will be taking place on Wednesday, April 12, 2017, from 8:00 am – 3:30 pm.

For additional questions on how this may impact your services, please contact Bruce Budzik at 541-346-8834.

 

4/5/17 – 4/11/17: Klamath Hall (night work) Asbestos Abatement

Building Occupants,

PMG (contractor) will be conducting asbestos abatement work above the ceiling spaces in the women’s restrooms from the basement through 3rd floor levels of Klamath Hall. The work will begin tonight (April 5th) at 5:00PM and is estimated to be completed by early next week at the latest. All work will be conducted at night between 5:00PM and 6:00AM.

For questions or concerns about this project, contact Nate Ferguson Safety & Risk Services at 346-2901.

 

  

4/3/17 – 4/7/17 – Huestis 2nd Floor – Demolition of Environmental Chambers

Building Occupants:

During the week of April 3-7 demolition and removal of the environmental chambers on the 2nd floor of Huestis is scheduled to begin. Chambers are located in Rooms: 232A, 226A, 226B, and 226C.  This activity is expected to last 2-4 weeks.  The typical work schedule  will be 4am – 8am.

As work begins, we will be able to partially demo some of the chambers to access the utilities that are concealed by the chambers. Once this field verification is complete, we will provide an update and advance notifications of any required shut-downs.

For questions or concerns about this project, contact Colin Brennan, CPFM Design and Construction at 346-8242.

3/31/17 Susan Campbell Hall and Hendricks Hall Domestic Water Shutdown

Building Occupants:

On Friday, March 31st from 8:30 am to 2:30 pm, the domestic water supply will be shut down to all fixtures in Susan Campbell Hall and Hendricks Hall.  Work is being performed to replace faulty water valves in the vault at the intersection of University & 15th, near Gerlinger. Sinks, toilets, urinals, drinking fountains, lavatory faucets, and janitorial faucets will also be affected in this area. Please plan ahead to make arrangements to use water in adjacent buildings during shutdown hours.

Work will be performed by Twin Rivers Plumbing.

For questions or concerns about how this may impact your area, contact Sarah Follett, CPFM Campus Planning, Design & Construction at 346-8264.

 

Esslinger Hall HVAC Preventative Maintenance 4/5/17

Building Occupants,

Due to scheduled preventative maintenance on the Esslinger Hall HVAC equipment, building occupants should expect intermittent shutdowns on air handling units and restroom exhaust fans to allow crews to change system filters.  This scheduled work will be taking place on Wednesday, April 5, 2017, from 8:00 am – 3:30 pm.

For additional questions on how this may impact your services, please contact Jim Cody at 541-346-2302.

 

Friendly Hall Tree Trimming South Side of Building. Sidewalk Closed 3/17/17

On Friday, March 17th the sidewalk on the south side of Friendly Hall will be closed due to a lift being utilized for tree trimming and gutter work from 7:30am to 2:00pm. Please use an alternate route due to safety concerns.

For questions or concerns about how this may impact paths of travel, contact Jim Cody Zone A Maintenance Manager at 541-346-2302.

Klamath Hall Fume Hood Preventative Maintenance 3/29/17

Building Occupants,

Due to scheduled preventative maintenance on Wednesday, March 29th, 2017,  Klamath Hall building occupants should expect shutdowns on the North side (basement and 3rd floor) fume hoods from 8:00 am – 11:30 am and South-side fume hoods (basement and 3rd floor) from 1:00 pm – 3:30 pm.

For lab safety fume hood sashes must be in the down position during this scheduled annual maintenance.