11/09/22 – 1/6/23 Area between Volcanology and Columbia Hall Excavation/Utility Work Advisory

UPDATE 11/29/22:

Due to some necessary engineering changes on this project the tentative completion date is now Friday, January 6th, 2023.  The steam will still be restored as scheduled after today’s work, 11/29/22 at 3:00 pm.

UPDATE 11/22/22:
Due to piping connections needing to be made as part of the emergency steam pipe repair project, steam service will be shut down on Tuesday, November 29th, 2022 from 7:00 am until 3:00 pm in Volcanology.
There will be no heat or hot water to the building for the duration of the work.
Steam service will be restored following its completion.

 

UPDATE 11/17/22:
S-2 Contracting will be performing core drilling, adjacent to Columbia Hall, as part of the Volcanology steam pipe emergency replacement project. They will begin work prior to building occupancy, starting at 7:00 am, and will be keeping noise to a minimum, as much as possible. The noise will be intermittent at times during the course of their work, but should not be at a level that will prevent normal operations.  They are expected to complete their task by 12:00 noon.

Begin:  Wednesday, November 9th, 2022 at 7:00 am

End:      Wednesday, November 30th, 2022 at 4:00 pm Friday, January 6th, 2023 at 4:00 pm

Building(s) or Area(s) Affected:  Area between Volcanology and Columbia

Scope:  Excavation activities will be taking place for several days, between 11/9/22 and 11/16/22, generating construction noise and possible vibration. Upon completion of excavation, piping installation work will follow, with an estimated end date of 11/30/22.

Services Impacted:  Fencing will be installed around the perimeter of the work area (shown as pictured) prior to the beginning of construction activities, which will restrict travel between the Volcanology building and Columbia Hall.

Special Instructions:  Please plan to take an alternate routes of travel during this time.

Work Performed By:  S2 Industrial and Pacific Excavation

ContactDamon Rutherford, CPFM D&C Owner’s Representative, 541-346-8285

To view current construction and impacts. visit UO Map.