Begin: Monday, August 28, 2023
End: Friday, September 1, 2023
Building(s) or Area(s) Affected: Riverfront Parkway between Millrace Drive and Franklin Boulevard
Scope: All lanes of Riverfront Parkway will be closed to modify utilities beneath the roadway. See the image below for detour routes.
Services Impacted:
- Riverfront Parkway will be closed to all vehicle traffic during this time as well as the eastbound left turn lane on Franklin Blvd.
- The east sidewalk will remain open for pedestrian traffic.
Work Performed By: Hoffman Construction
Contact: Denise Stewart, CPFM Owner’s Representative, 541-346-2280 or 541-335-1258
Current construction and impacts information can be found on the UO Maps site.