Begin: Saturday, March 25, 2023, at 7:00 am
End: Saturday, March 25, 2023, at 4:00 pm
Building(s) or Area(s) Affected: Huestis Hall Basement and Lokey Labs
Scope: As part of the Huestis Hall Renovation project, there will be a power outage affecting Huestis Basement and Lokey Labs. Lokey Labs standby power via panel 4A1, Huestis Basement normal power via panels 4L1, BN1-4, BN2-4.
Services Impacted: This will affect lab exhaust fans 1 and 2, AHU 1 and 2 and the fire alarm system in the Huestis Basement. Glass and rack washers will also be offline.
Special Instructions: Please shut down and unplug all multi-function copier devices as well as any printers during scheduled power outages. The software on these machines can be negatively affected due to the power surge when the power is turned back on. A power surge can corrupt the clone files in the machines and change preconfigured settings. For questions, please contact Kati Kronholm at 541-346-5370 or katik@uoregon.edu.
Additional Instructions: Fume hood sashes should be closed and containers within the fume hoods sealed prior to this date.
Work Performed By: EC Electric, Lewis Construction
Contact: Martina Oxoby, CPFM Owner’s Representative, 541-346-5880
Current construction and impacts information can be found on the UO Maps site.