Seasonal Building Steam Management Fall 2020

Buildings or Areas Impacted:

  • Agate Hall (gym/auditorium)
  • Cascade Annex
  • Collier House
  • Columbia Hall (Room 154)
  • Condon
  • Esslinger
  • Fine Arts Studios
  • Friendly
  • Gerlinger
  • Hendricks
  • Huestis (heat exchanger HEX-3 only for fin tube radiators)
  • Lawrence (primary studios)
  • Lokey Education (East and West)
  • Mac Court (radiators only)
  • Millrace Woodshop
  • Music (radiators only)
  • Onyx Bridge (072/090, 169/170)
  • Susan Campbell
  • University Hall
  • Villard
  • Volcanology

Scope:  Starting the week of October 19th the Mechanical shop will start turning on the steam to campus buildings. This process can take several days depending on how many problems may arise from the process.

Services Impacted:  Potential noise coming from the pipe and radiators as the steam is turned on and warms up the system.

Special Instructions:  If you discover any radiator leaks or persistent noise, please notify CPFM Work Control at 541-346-2319 or workcontrolcenter@uoregon.edu.

Additional Notes:  Turning on and off the steam is very hard on the infrastructure serving our building’s mechanical systems.  Seasonal adjustments are based on the following format:

Steam is turned on in the Fall when:

  • Night-time outside air temperature is below 50 degrees for five consecutive nights
  • AND daytime temperatures are below 70 degrees for five consecutive days

Steam is turned off in the Spring when:

  • Night-time outside air temperatures are above 50 degrees for five consecutive nights
  • AND the daytime temperature is above 70 degrees for five consecutive days

Work Performed By:   Campus Planning and Facilities Management Facilities Services

ContactKen Straw, CPFM Mechanical and Plumbing Shop Manager, 541-346-5406

 

Campus Wide Radio Communications Shutdown 10/17/20

Begin: Saturday, October 17th, 2020 at 7:00 am

End: Saturday, October 17th, 2020 at 12:00 noon

Building(s) or Area(s) Impacted: PLC and Campus Wide

Scope: The radio communications system on the roof of the PLC will be shutdown to allow workers to safely install the remainder of the safety rail system.

Services Impacted:

  • Campus radios will not function during this shutdown and it is recommended that campus staff carry cell phones for emergency communications during this time.
  • UOPD communications will not be affected.

Extra Notes: The work is weather dependent and will be rescheduled should the forecast change and call for significate rain.

Work Performed By: Anderson Construction

Contact: Luke Helm, CPFM Owner’s Representative, 458-256-7622.

Knight Law Center Air Handling Systems Shutdown 10/21/20 and 10/23/20

Building Impacted:  Knight Law Center

Scope:  Facilities Services is currently responding to the impacts of the recent fire/smoke event.  As a result, all building air handling systems will be taken off-line, cleaned and all filters replaced.

Dates and Times:

  • Wednesday, October 21st, 2020 at 8:00 am – 3:00 pm
  • Friday, October 23rd, 2020 at 8:00 am – 3:00 pm

Services Impacted:  This will affect the building’s cooling, cooling tower, heating, and HVAC air supply.

Extra Notes:  Attached is the link to the original campus wide emergency HVAC filter replacement project notice  https://blogs.uoregon.edu/cpfmnotifications/2020/09/21/campus-wide-hvac-filter-replacement/

Work Performed By:   UO CPFM Facilities Services

ContactKen Straw, CPFM Mechanical and Plumbing Shop Manager, 541-346-5406

Allen Hall Air Handling Systems Shutdown 10/19/20

Building Impacted:  Allen Hall

Scope:  Facilities Services is currently responding to the impacts of the recent fire/smoke event.  As a result, all building air handling systems will be taken off-line, cleaned and all filters replaced.

Begin:  Monday, October 19th, 2020 at 8:00 am

End:      Monday, October 19th, 2020 at 3:00 pm

Services Impacted:  This will affect the building’s cooling, cooling tower, heating, and HVAC air supply.

Extra Notes:  Attached is the link to the original campus wide emergency HVAC filter replacement project notice  https://blogs.uoregon.edu/cpfmnotifications/2020/09/21/campus-wide-hvac-filter-replacement/

Work Performed By:   UO CPFM Facilities Services

ContactKen Straw, CPFM Mechanical and Plumbing Shop Manager, 541-346-5406