McKenzie Hall Renovation Advisory Notice for North End of Second Floor 12/13/19 – 1/5/20

12/13/19 DATE REVISION:  Date should have read as 12/13 instead of 12/20

 

11/21/19 Original Notice:

On Friday, December 20th, 2019 December 13th, 2019, beginning at 12:00 noon, through Sunday, January 5th, 2020, renovations will take place on the north end of McKenzie Hall, on the 2nd floor.  Work will be done on rooms 240A and 240C but contractors will be using the north end of the building and, at limited times, the exit and ramp on the east side and the main entrance on the south side.

Power may be shut off to the rooms, but it will be localized as much as possible and for short periods.

The affected area will be off limits to students and staff during winter break, including the foyer area in between the rooms, extending to the exit on the east side, down the ramp, and along the sidewalk to the dumpster.

On January 2nd and 3rd, furniture delivery will take place from the south main entry, along the main hall, to rooms 240 A, B, and C.

Work will be performed by Preferred Construction, Rubenstein Carpet Contractors, PMG, Hyphn, and UO Facilities Services.

For questions or concerns, please contact Luke Helm at 541-346-8216 or lhelm@uoregon.edu.