Begin: Monday, December 1, 2025, at 5:00 am
End: Friday, December 5, 2025, at 4:00 pm
Building(s) or Area(s) Affected: Lot #9 between University Hall and Villard Hall
Scope: The parking lot between Villard Hall and University Hall (Lot #9) will be closed to general parking for Heritage Project landscaping work and art footing installation. The mornings of 12/1 and 12/2, between 5:00 am and 8:00 am, there will be a Vac-X truck removing some soil in some of the planters. Following that work (8:00 am – 4:00 pm), there will be a few days of concrete trucks and landscaping trucks using the parking lot to pour footings for an upcoming exterior art installation.
Services Impacted:
- Parking spots, including ADA spots, will be offline in the upper lot (#9). We will make accommodations for ADA shuttle drops offs or other drops offs as needed. ADA spaces will be available for use in front of the Miller Theatre Complex.
- The Miller Theatre Complex loading dock will still be operational.
- The Vac-X truck will be very loud but will conclude work before 8:00 am.
- There may be some residual noise with the concrete trucks and workers in the plaza area.
Work Performed By: Fortis and Rexius
Contact: Tim Allenbaugh, CPFM Owner’s Representative, 541-346-8214
Current construction and impacts information can be found on the UO Maps site.