Begin: Friday, November 21, 2025, at 8:00 am
End: Friday, November 21, 2025, at 1:00 pm
Building(s) or Area(s) Affected: Hendricks Hall – entrance areas for the NW and E sides
Scope: Maintenance staff will be pressure washing multiple entrances at Hendricks Hall on the NW side of the building to clean off organic material build up. The stairwell on the east side leading into vestibule 026 will also be cleaned.
Services Impacted:
- Building users can expect elevated noise levels in the area from the pressure washing equipment.
- Building users are advised to avoid using the entryways at stairwell S103, S104, and the entrance at hallway 100 on the west side of the building during work.
- Building users should avoid using the stairwell on the east side of the building leading to vestibule 026 as well.
Special Instructions: Building users will be able to enter and exit through stairwell S102 or Lobby 119.
Work Performed By: CPFM Maintenance Support
Contact: Gabe Hein, CPFM Maintenance Support Supervisor, 541-346-7563
Work Control Center, Campus Planning and Facilities Management, 541-346-2319
Current construction and impacts information can be found on the UO Maps site.
