10/24/25 – 10/25/25 Millrace Drive Geotechnical Drilling and Traffic Advisory

Begin:  Thursday, October 24, 2024, at 7:00 am

End:      Friday, October 25, 2024, at 5:00 pm

Building(s) or Area(s) Affected:  Millrace Drive at Millrace waterway

Scope:  EWEB’s contractor Foundation Engineering Inc. will be conducting a geotechnical investigation on Millrace Drive and will be drilling two boring holes.

Services Impacted: 

  • This will require the use of drilling equipment in the street which may result in noise.
  • Millrace Drive will be closed, but access to all driveways and sidewalks will be maintained.

Work Performed By:  EWEB and Foundation Engineering, Inc.

Please contact EWEB Water Operations at 541-685-7595 if you have any questions.

Current construction and impacts information can be found on the UO Maps site.

Overhead map view of Millrace Drive and Millrace waterway drilling location 10/24/25 - 10/25/25