Begin: Monday, July 24, 2023
End: Tuesday, August 8, 2023
Building(s) or Area(s) Affected: Knight Library
Scope: The furniture on the 2nd floor will be removed and new furniture will be installed.
Services Impacted:
- This will affect the entire 2nd floor. (The 2nd floor reading room will be closed.)
- Noise can be expected as work is carried out.
- The loading dock will be utilized during this time.
Work Performed By: PacificWRO
Contact: Brianna Liberty, CPFM D&C Design Associate, 541-346-7612 or 541-556-9618
Current construction and impacts information can be found on the UO Maps site.