9/14/22 Lokey Labs Electrical Shutdown

Begin:  Wednesday, September 14th, 2022 at 6:00 am

End:      Wednesday, September 14th, 2022 at 7:00 am

Building and Area:  Lokey Labs

Scope: As part of the Huestis Renovation Project, there will be a brief shutdown of electrical panel 2N2 and 2N2A

Services Impacted:  This electrical outage will affect the chilled water, compressed air, power, exhaust, fume hoods, and HVAC air supply.

Special Instructions:  Fume hood sashes should be closed and containers within the fume hoods sealed prior to this date.

Additional Instructions:  Please shut down and unplug all multi-function copier devices as well as any printers during scheduled power outages. The software on these machines can be negatively affected due to the power surge when the power is turned back on.  A power surge can corrupt the clone files in the machines and change preconfigured settings.

Work Performed By:  Lease Crutcher Lewis and EC

Contact: Martina Oxoby, CPFM Owner’s Representative, 541-346-5880

To view current construction and impacts. visit UO Map.