Chiles 328 Renovation Work 12/10 – 1/4

Building Occupants,

Preferred Construction and their sub-contractors will be doing renovation work in the Chiles 326 computer lab from 12/10 to 1/4. It will involve building three new rooms in the existing space. Work will include demo, framing, drywall, painting, electrical and mechanical work. Users can expect to hear normal and occasional construction noises such as hammering and drilling and may smell at times water-based latex, non-toxic paint. Occupants will see the general contractor and their subs entering/exiting the building with tools and materials during regular business hours.

At times users may expect longer wait times at the elevator as items are loaded/unloaded in the elevator during the course of work. No utility disruptions or shutdowns are scheduled at this time.

For questions or concerns please contact CPFM Design and Construction Project Manager Theo Davis at 541-346-1012.