UPDATE for 12/19/25:
The following update is for specific work impacts occurring in Huestis Hall this Friday, December 19.
Heat exchangers will be shut off Friday, December 19th to allow warranty repairs. Only one heat exchanger will be shut down at a time. Due to this redundancy, users should not experience any impacts. The shutdowns will begin at 9:00 am and last approximately 4 hours. The Zebrafish facility will not be impacted by this work.
Contractors will be replacing sink parts in room 211 at 8:30 am. Users should be aware that this sink will be offline for 24 hours, through Saturday, December 20th, at 9:00 am. A sign will be posted on the sink.
Contractors will be rehanging curtains in microscopy rooms 305C, 305D, 305H between 8:00 am and 4:00 pm.
Thank you for your patience and understanding.
Thanks,
Martina
Begin: Friday, December 12, 2025, at 7:00 am
End: Wednesday, December 31, 2025 – end of day
Building(s) or Area(s) Affected: Huestis Hall
Scope: Warranty repair work is expected to occur during winter break in Huestis Hall. This includes paint touchups on level 1, work in mechanical rooms and ductwork adjustments on levels 2 and 3. At this time, no shutdowns are anticipated. If shutdowns are required, updates to this notice will be sent out.
Services Impacted: Occupants can expect to see contractors in the building on ladders.
Work Performed By: LCL, JH Kelly, and WPI
Contact: Martina Oxoby, CPFM Senior Owner’s Representative, 541-346-5880
Current construction and impacts information can be found on the UO Maps site.