Begin: Monday, October 13, 2025 at 7:00 am
End: Monday, October 13, 2025 at 5:00 pm
Building(s) or Area(s) Affected: Onyx Bridge and Cascade Annex
Scope: To support the Onyx Bridge EHS renovation project, a diesel generator will be placed on the sidewalk section between Cascade Annex East and Onyx Bridge. The generator is expected to run off and on for a period of 5 or 6 hours. A power cord covered with a cable protector will cross the adjacent sidewalk, running into Onyx Bridge.
Services Impacted: No impediments to pedestrian traffic on the sidewalk or authorized work vehicles are expected. Noise from the running generator can be expected in the surrounding area and nearby buildings.
Special Instructions: Please report any Indoor Air Quality (IAQ) issues to Environmental Health and Safety.
Work Performed By: Ryan Thomas Construction
Contact: Waymon Banks, CPFM Owner’s Representative, 541-346-0196
Current construction and impacts information can be found on the UO Maps site.