Begin: Thursday, July 31, 2025 – effective immediately
End: Unknown
Building(s) or Area(s) Affected: Millrace Path on the south side of 1600 Millrace
Scope: The Millrace Path is currently closed from Riverfront Parkway to the first sidewalk connection on the south side of the 1600 Millrace building. This closure is due to a damaged pin oak tree with significant limb failure. A contractor will be evaluating the situation this afternoon.
Services Impacted: The area has been cordoned off to redirect foot and bike traffic. Pedestrians and cyclists can safely detour using the sidewalk around 1600 Millrace to reach the Riverfront Pkwy sidewalk or walk across the 1600 lawn.
Work Performed By: Contractor
Contact: Tim Winder, CPFM Landscape Maintenance Manager, 541-346-5771
Work Control Center, Campus Planning and Facilities Management, 541-346-2319
Current construction and impacts information can be found on the UO Maps site.
