5/10/25 – 5/11/25 Riverfront Parkway Crane Activity and Road Closure

Begin:  Saturday, May 10, 2025

End:      Sunday, May 11, 2025  (Sunday closure will be as needed until work is complete.)

Building(s) or Area(s) Affected:  Knight Campus 1, Millrace Garage, and 1600 Millrace. (Riverfront Parkway between Millrace Drive and Franklin Boulevard)

Scope:  All lanes of Riverfront Parkway will be closed to remove a tower crane.

Services Impacted:  Both lanes will be closed, but the east sidewalk will remain open for pedestrian traffic. See the image below for detour routes.

Work Performed By:  Hoffman Construction

ContactDenise Stewart, CPFM Owner’s Representative, 541-346-2280 or 541-335-1258

Current construction and impacts information can be found on the UO Maps site.