Begin: Saturday, May 10, 2025
End: Sunday, May 11, 2025 (Sunday closure will be as needed until work is complete.)
Building(s) or Area(s) Affected: Knight Campus 1, Millrace Garage, and 1600 Millrace. (Riverfront Parkway between Millrace Drive and Franklin Boulevard)
Scope: All lanes of Riverfront Parkway will be closed to remove a tower crane.
Services Impacted: Both lanes will be closed, but the east sidewalk will remain open for pedestrian traffic. See the image below for detour routes.
Work Performed By: Hoffman Construction
Contact: Denise Stewart, CPFM Owner’s Representative, 541-346-2280 or 541-335-1258
Current construction and impacts information can be found on the UO Maps site.
