11/18/24 – June 2025 – Knight Campus Buildings 1 and 2 Skybridge Work Advisory

Begin:  Monday, November 18, 2024

End:      June 2025

Building(s) or Area(s) Affected:  Knight Campus Building 1, North entry – See attached map.

Scope:  Construction of a new skybridge connecting Knight Campus Buildings 1 and 2 requires closure of the north entry of Building 1 and closure of the pedestrian boardwalk between Building 1 and the Millrace. Clear pathways for emergency egress will be maintained.

Services Impacted:  Pedestrians detour path is south of Building 1 along Franklin Blvd

Work Performed By:  Hoffman Construction

ContactDenise Stewart, CPFM Owner’s Representative, 541-346-2280 or 541-335-1258

Current construction and impacts information can be found on the UO Maps site.

241118_Knight Campus 2_Skybridge Construction Closure Map

Map of Knight Campus 2 Skybridge Construction Closure