12/15/23 Willamette Hall MBC1 Swap Out Emergency Shutdown

Begin:  Friday, December 15, 2023, at 10:00 am

End:      Friday, December 15, 2023, at 10:30 am

Building(s) or Area(s) Impacted:  Willamette Hall

Scope:  Here is a list of effected equipment which will be down for approximately 15-30 minutes during an emergency swapping out of the processor on MBC1.

Equipment and Areas Affected:

  • Willamette AHU-1 – Floors 1-4 east wing
  • Willamette AHU-2 – Zebrafish quarantine
  • Willamette SF-8/9 – East labs
  • Willamette AHU-7 – Generator room
  • Willamette heating water system
  • Willamette heat recovery system

Work Performed By:  CPFM Facilities

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Image of Willamette Hall