5/14/22 & 5/21/22 Huestis Hall, Lokey Labs, and Willamette Hall Domestic Water Shutdown – Update

UPDATE:
The fire water line shutdown will still occur 5/14 as scheduled, however the domestic water shutdown has been rescheduled for next Saturday, May 21, due to delays in materials.  Willamette Hall will also be affected by the domestic water shutdown on Saturday, May 21st.

 

 

Fire Water Line:  Saturday, May 14th, 2022 from 7:00 am till 3:00 pm

Domestic Water Line:   Saturday, May 21st, 2022 from 7:00 am till 3:00 pm

Building(s) or Area(s) Impacted:  Huestis Hall and Lokey Labs (and Willamette Hall 5/21)

Scope:  As part of the Huestis Hall Renovation project, the main domestic water line and fire water line will be shut down on Saturday for 8 hours.

Services Impacted:  All services that need water will be unavailable during this time. This could include lab equipment, HVAC building equipment, fire sprinkler systems, and restroom plumbing services.

Details:  Horns, Strobes, and Speakers on the fire alarm system will not sound after the scheduled time. Provisions have been taken to monitor the building fire systems during this time and alarms that occur after the scheduled time should be considered real events and occupants should evacuate as usual per the U of O Emergency Procedures.

Special Instructions:  If there are questions regarding emergency evacuation, please visit Emergency Management & Continuity, https://safety.uoregon.edu/evacuations.

Work Performed By:  Mortenson Construction

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880