UPDATE 7/15/21
The work has been completed at this time.
The drilling scheduled for Friday has been cancelled.
Begin: Thursday, July 15th, 2021
End: Friday, July 16th, 2021
Building(s) or Area(s) Impacted: Locations around Fine Arts Studios, Millrace Studios, and Greenhouses
Scope: There will be geo-technical drilling occurring on Thursday and Friday of this week. As we have been working through drilling more than a dozen holes in various locations, we could not predict exact timing prior to today. (Image attached)
Thursday – Drilling two holes along the gravel road between the greenhouses and the art studios, requiring closure of the road to through traffic.
Friday – Drilling two holes between the woodshop and the Art Studios.
Services Impacted:
- The drilling should have minimal impact.
- Lot 4 will be open for parking during this time.
- The gravel road between the greenhouses and art studios will be closed on Thursday.
- FS staff will need to re-route up Onyx, for those vehicles that use that road as a daily route.
- Access for Greenhouse researchers has already been coordinated.
Work Performed By: A contractor
Contact: Darin Dehle, CPFM Director Capital Construction, 541-346-2282