Willamette Hall Steam Supply/Heating Water Shutdown 6/22/21

Begin: Tuesday, June 22nd, 2021 at 7:00 am

End: Tuesday, June 22nd, 2021 at 3:00 pm

Building(s) or Area(s) Impacted:  Willamette Hall

Scope:  The steam supply/heating water will be shut down in order to replace the heating water main isolation valve in Mechanical Room #50.  This will be happening at the same time as the Hot Water shutdown to remove a backflow assembly.

Services Impacted: This will affect the steam condensate, building heat, and the domestic hot water in sinks.

Work Performed By: CPFM FS Mechanical Shop

Contact: Richard Vaughan, CPFM Facilities Services, 541-346-2319