Begin: Tuesday, June 22nd, 2021 at 7:00 am
End: Tuesday, June 22nd, 2021 at 3:00 pm
Building(s) or Area(s) Impacted: Willamette Hall
Scope: The steam supply/heating water will be shut down in order to replace the heating water main isolation valve in Mechanical Room #50. This will be happening at the same time as the Hot Water shutdown to remove a backflow assembly.
Services Impacted: This will affect the steam condensate, building heat, and the domestic hot water in sinks.
Work Performed By: CPFM FS Mechanical Shop
Contact: Richard Vaughan, CPFM Facilities Services, 541-346-2319