LISB, Sidewalks, and Parking Lot 12B MRI Installation Advisory and Closures 7/6/2020

Begin:  Monday, July 6th, 2020 at 7:00 am

End:      Wednesday, July 8th, 2020 at 6:00 pm

Building(s) or Area(s) Impacted:  Lewis Integrative Science Building and Lot 12B

Scope:  The east end of Lot 12B, sidewalks, and the north entry to LISB will be closed July 6-8 to accommodate the delivery and installation of an MRI to the Lewis Center for Neuroimaging in LISB.

Services Impacted:

  • Sidewalks north of LISB and the north entry to LISB will be signed and closed.
  • All pedestrian traffic in this area will be rerouted south.

Work Performed By:   Ness Campbell, Siemens, and GBC

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880