Begin: Monday, July 6th, 2020 at 7:00 am
End: Wednesday, July 8th, 2020 at 6:00 pm
Building(s) or Area(s) Impacted: Lewis Integrative Science Building and Lot 12B
Scope: The east end of Lot 12B, sidewalks, and the north entry to LISB will be closed July 6-8 to accommodate the delivery and installation of an MRI to the Lewis Center for Neuroimaging in LISB.
Services Impacted:
- Sidewalks north of LISB and the north entry to LISB will be signed and closed.
- All pedestrian traffic in this area will be rerouted south.
Work Performed By: Ness Campbell, Siemens, and GBC
Contact: Martina Oxoby, CPFM Owner’s Representative, 541-346-5880