Begin: Friday, July 16th, 2021
End: Friday, July 16th, 2021
Building(s) or Area(s) Impacted: ZIRC, Lot 03A, and street in between building and parking spots
Scope: The ZIRC project will be hoisting a Conex Box into the courtyard on the south side of the building. The street will be momentary blocked during the day while equipment is hoisted into place.
Services Impacted: Lot 03A and the street in between ZIRC and the parking spots will be temporarily blocked.
Work Performed By: Fortis Construction
Contact: Colin Brennan, CPFM Owner’s Representative, 541-346-8242 or 541-654-2972