UPDATE 12/15/23:
Installation work is complete. All walkways between Streisinger and LISB are open.
UPDATE 12/5/23:
Access to and through Lewis Integrative Science Building has changed:
- Pedestrians will be routed around equipment and are encouraged to find alternate paths. See attached mobilization plans for active work areas (blue) and pedestrian pathways (green). Elevators in LISB will be open and available throughout the project. Pedestrians traveling between Streisinger and LISB need to be prepared to travel to the 3rd floor of Klamath and the 4th floor of Streisinger to connect to LISB or travel outside and use the north entrance of LISB.
Begin: Monday, December 4, 2023
End: Friday, December 15, 2023
Building(s) or Area(s) Affected: Lewis Integrative Science Building (LISB) and Streisinger Hall
Scope: Artwork will be installed, over the next two weeks, in the west entry atrium of the Lewis Integrative Science Building.
Services Impacted:
- During this installation, the lifts will be mobilized on LISB level 1.5 and periodically on each landing between LISB and Streisinger while overhead work is underway.
- Pedestrians will be routed around equipment and are encouraged to find alternate paths. See attached mobilization plans for active work areas (blue) and pedestrian pathways (green). Elevators in LISB will be open and available throughout the project. Pedestrians traveling between Streisinger and LISB need to be prepared to travel to the 3rd floor of Klamath and the 4th floor of Streisinger to connect to LISB or travel outside and use the north entrance of LISB.
- Occupants on Streisinger 4th floor should find an alternate path through Streisinger when the lift is on the LISB walkway.
- See attached mobilization plans for active work areas (blue) and pedestrian pathways (green).
- There will be construction related noises as the artwork is installed into concrete structure on December 4 -8.
- Overhead work will continue through the week of December 11.
Work Performed By: Omega Morgan and Rob Ley Studio
Contact: Martina Oxoby, CPFM Owner’s Representative, 541-346-5880
Current construction and impacts information can be found on the UO Maps site.