1/15/26 – 1/16/26 – 1658 Columbia Alley Exterior Grounds Asphalt/Concrete Cutting and Electrical Work Advisory

Begin:  Thursday, January 15, 2026, at 8:00 am

End:      Friday, January 16, 2026, at 5:00 pm

Building(s) or Area(s) Affected:  1658 Columbia Alley (517) and area between building and north carport

Scope:  Electricians will be saw cutting asphalt and concrete to install underground electrical to get power and lights to north carport and newly installed shed on east and west sides of building 517.

Services Impacted:  There will be noise during saw cutting. This will not last throughout the two days but periodically.

Work Performed By:  BELCO Electric

ContactRenee Benoit, CPFM Owner’s Representative, 541-346-5080

Current construction and impacts information can be found on the UO Maps site.