Begin: Monday, December 22, 2025, at 6:00 am
End: Monday, December 22, 2025, at 8:30 am
Building(s) or Area(s) Affected: Erb Memorial Union (EMU)
Scope: Utilities and Energy will be swapping the feeder that powers the EMU with a new feeder as part of our feeder replacement plan. In addition, Utilities and Energy staff will work with EMU staff to perform electrical Maintenance on the 208/120-volt electrical distribution system in compliance with NFPA – 70E and NFPA – 70B.
Services Impacted:
- Normal power 120-volt service will be off.
- The elevators will be shut down during this time.
- Standby power and 480-volt power will remain online.
Special Instructions: If you have concerns about accessing your workplace when elevator services are impacted, please contact your supervisor to find an appropriate accommodation.
Special Instructions: Please shut down and unplug all multi-function copier devices as well as any printers during scheduled power outages. The software on these machines can be negatively affected due to the power surge when the power is turned back on. A power surge can corrupt the clone files in the machines and change preconfigured settings. For questions, please contact Kati Kronholm at 541-346-5370 or katik@uoregon.edu. For non-copier questions, please reach out to the contact person listed below.
Work Performed By: CPFM Utilities & Energy Electricians
Contact: Work Control Center, Campus Planning and Facilities Management, 541-346-2319
Current construction and impacts information can be found on the UO Maps site.
