1/13/25 – 1/15/25 Bean Hall Chilled Water Shutdown

Begin:  Monday, January 13, 2025, at 7:00 am

End:      Wednesday, January 15, 2025, at 3:00 pm

Building(s) or Area(s) Affected:  Bean Hall

Scope:  Due to the relocation of a utility chilled water flow meter and installation of a bypass pipeline, building air conditioning will be unavailable.  Due to brief pipe cutting and welding, odors will be present in the basement mechanical area.

Services Impacted:

  • Air conditioning will be offline during this time.
  • Odors may be present in the basement.  A welding odor reducing machine and exhaust fans will be deployed to mitigate odors.
  • Work will take place in the utility tunnel and Bean basement mechanical room 003.

Work Performed By:  CPFM Utilities & Energy and Hydro Temp Mechanical

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319