11/03/23 Lot 12B (North of Streisinger Hall) Shutdown

Begin:  Friday, November 3, 2023, at 7:00 am

End:      Friday, November 3, 2023, at 10:00 am

Building(s) or Area(s) Affected:  Lot 12B (North of Streisinger Hall)

Scope:  Due to a crane pick, the east side of lot 12B (shown as pictured) will not be available for use during this time.

Services Impacted:

  • The area will be cordoned off, but please be sure to maintain your awareness in the surrounding area and to take alternative paths as needed.
  • This will also affect the adjacent loading dock.

Work Performed By:  Bridgeway Construction & Hermanson

ContactDamon Rutherford, CPFM D&C Owner’s Representative, 541-346-8285

Current construction and impacts information can be found on the UO Maps site.