10/23/23, 10/26/23, 10/30/23, 11/03/23 Willamette Hall, Huestis Hall, Streisinger Hall, and Lokey Labs Compressed Air Shutdown

UPDATE 10/30/23:
The shutdown today was not successful.  The shutdown of compressed air will be rescheduled for Friday, November 3rd from 9:00 am – 1:00 pm.

  • Lokey Labs will not have compressed air during this shutdown. Please shut down affected equipment.

 

UPDATE 10/23/23:
Today’s test at Willamette Hall and Streisinger Hall was unsuccessful.  CPFM Facilities has ordered additional parts and rescheduled the test for Thursday, October 26th, from 7:00 am to 12:00 noon.

 

1st Test:   Monday, October 23, 2023, at 7:00 am – 12:00 noon

2nd Test:   Thursday, October 26, 2023, at 7:00 am – 12:00 noon

Final Day:  Monday, October 30, 2023, at 7:00 am – 1:00 pm  Friday, November 3, 2023, at 9:00 am – 1:00 pm

Building(s) or Area(s) Affected:  Willamette Hall, Huestis Hall, Streisinger Hall, and Lokey Labs

Scope:  As part of the Huestis Renovation project, the campus supplied compressed air system will be offline as follows:

Monday, October 23, 2023, 7:00 am – 12:00 noon: Outage in Streisinger and Willamette Halls.

  • Streisinger and Willamette Halls – Building supplied compressed air will go offline to allow adequate testing of the emergency backup compressor units. Users will experience limited to no availability of compressed air which is likely to affect air turrets at lab benches and possibly affect building heating and cooling supply. Users should plan to limit their use of the emergency supplied compressed air during this period.
  • Huestis Hall – No impact to compressed air service anticipated during this test period.
  • Lokey Labs – No impact to compressed air service anticipated during this test period.

Monday, October 30, 2023, 7:00 am – 1:00 pm: Outage in Huestis, Lokey Labs, Willamette and Streisinger.

  • At Streisinger and Willamette Halls, following the test results of the emergency backup air supply, users will experience a lower flow of available compressed air via lab turrets. Users should plan to limit use during this period. Heating and cooling supply may be affected during this period.
  • Lokey Labs will be supplied by a temporary air compressor. Users should plan to limit use during this period.
  • Huestis Hall will not have compressed air during the shutdown. Please shut down affected equipment.

Work Performed By:  JH Kelly

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880

Current construction and impacts information can be found on the UO Maps site.