9/14/23 – 3/29/24 North Campus Concrete Truck Activity Advisory

Begin:  Thursday, September 14, 2023

End:      Friday, March 29, 2024

Building(s) or Area(s) Affected:  North Campus, Lot 3B, and Gallery Way.

Scope:  Periodically between 9/14/23 and 3/29/24 there will be concrete trucks delivering to the utility tunnel construction located between the Woodshop and Fine Arts Building C. The map below shows the truck routes in and out of the site.

Services Impacted:  On days that concrete trucks are delivering, parking stall #39 in Lot 3B will be closed for trucks to safely navigate the left hand turn off of Gallery Way.

Work Performed By:  Hoffman Construction

ContactDenise Stewart, CPFM Owner’s Representative, 541-346-2280 or 541-335-1258

Current construction and impacts information can be found on the UO Maps site.