7/25/23 Lot 2 Irrigation Leak Repair Advisory

Begin:  Tuesday, July 25, 2023, at 8:00 am

End:      Tuesday, July 25, 2023, at 3:00 pm

Building(s) or Area(s) Affected:  Lot 2 (south of CPFM Warehouse) Spaces 48 and 87

Scope:  To vac up and then delete a lateral irrigation line that is currently leaking under the asphalt in the parking lot, the vac truck will need to utilize two parking spaces.

Services Impacted:  Slots 48 and 87 will be unavailable during this time.

Work Performed By:  CPFM Facilities

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Image of parking spaces in Lot 2