5/26/23 – 5/27/23 Allen Hall Chilled Water Shutdown

UPDATE:
The shutdown to repair the leaking chilled water line will now occur on Friday, May 26th due to parts availability issues.

 

Begin:  Friday, May 19  26, 2023, at 8:00 am

End:      Saturday, May 20  27, 2023, at 10:00 am

Building(s) or Area(s) Affected:  Allen Hall

Scope:  In order to repair a leaking fitting, the chilled water supplying chilled beams will be shut off. The duration of the shut down will extend into the weekend to allow for the glue used to set to manufacturers specifications.

Services Impacted:  This will affect the academic spaces with chilled beams on the first and second floors. Airflow will continue, but cooling ability will be reduced until the chilled water is restored mid-day Saturday.

Work Performed By:  CPFM Facilities Plumbing Shop

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Image of Allen Hall