9/26/22 – 9/30/22 University Hall and Villard Hall Light Construction Advisory – REVISED DATE

DATE REVISED:
The work described in this notice was unfortunately postponed but has been rescheduled for Monday, September 26 through Friday, September 30.

 

Begin:  Monday, September 12th, 26th, 2022 at 8:00 am

End:      Friday, September 16th, 30th, 2022 at 4:00 pm

Building(s) or Area(s) Affected:  University Hall and Villard Hall

Scope:  For the “Heritage Project” (University and Villard Halls), our General Contractor (Fortis) will be performing some very light selective demolition within both buildings. This will range from drilling some small holes, to opening up some larger areas in walls and floors to assess and document existing conditions. EH&S has approved the assessment locations. All areas will be covered and safe immediately after each task takes place.

Services Impacted:  Light construction in these locations:

  • University Hall – General public areas, hallways, and room 012, and 011A
  • Villard Hall – Basement hallway (003), Pocket Playhouse (024), and storage room (011)

Work Performed By:  Fortis Construction

ContactTim Allenbaugh, CPFM Owner’s Representative, 541-346-8214

To view current construction and impacts. visit UO Map.