Begin: August 1, 2022
End: September 16, 2022
Building(s) or Area(s) Impacted: McKenzie Hall 121-123, H121, H125, 111, 113, 115, and 116
Scope: During a recent flood in the mechanical room, ducts that provide ventilation to a portion of the first floor were damaged and cannot be re-used. New overhead ductwork and sprinkler piping to serve the classrooms and hallways shown will be installed.
Services Impacted: We will be closing part of the SW section of McKenzie Hall to install new ductwork to classrooms 121-123 and the adjacent hallways H121 and H125. There will be no access to restrooms 111, 113, 115, and 116. Second floor rooms above the construction zone will experience light noise from work on first floor.
Work Performed By: Harvey & Price
Contact: Jeff Madsen, CPFM Asst. Dir Engineer Utility Systems, 541-346-2256