Begin: Monday, April 25th, 2022 at 6:00 am
End: Friday, April 29th, 2022 at 5:00 pm
Building(s) or Area(s) Impacted: Lane between ZIRC and Millrace Studio 3
Scope: The road will be closed between ZIRC and the Millrace Studios to complete underground utility work.
Services Impacted: Access will be blocked off during this time.
Special Instructions: A detour is available on the north side of the CPFM Administration Quonset or access can be obtained from the east via Riverfront Parkway.
Work Performed By: Fortis Construction
Contact: Colin Brennan, CPFM Owner’s Representative, 541-346-8242 or 541-654-2972