Begin: Saturday, May 22nd, 2021 at 7:00 am
End: Saturday, May 22, 2021 at 3:30 pm
Building(s) or Area(s) Impacted: Klamath Hall – 2nd Level
Scope: Supply Fan 4 will be shut down to install a new damper in the west hallway supply air ductwork (serving Guillemin Lab). Concurrent with install of the damper, Apollo will be re-cutting and capping the existing ductwork in the north shaft. This shut down is required to ensure a good seal on new connections prior to pressurizing.
Services Impacted: The HVAC air supply to all of level 2 will be offline.
Work Performed By: Apollo
Contacts: Jeff Hanson, CPFM Construction Project Manager, 541-346-7991