Building or Area Impacted: CPFM Warehouse and Shops
Scope: An air handler/ducting installation project.
Project Duration: Monday, October 19th, 2020 through Tuesday, December 15th, 2020
Scope Specific to Monday 10/19/20 from 8:00 am to 5:00 pm: Large HVAC equipment will be lifted up onto the platform above the restrooms.
Services Impacted on Monday 10/19/20: The following areas will be intermittently inaccessible due to overhead work:
- Warehouse breezeway (H109)
- Open workspace (room 116)
- Restrooms (118, 117A, 117B, 117C, 117D, and 118)
Work Performed By: Preferred Construction and Hydro-Temp
Contact: Tim Allenbaugh, CPFM Project Manager, 541-346-8214